Skip to content
079-350 31 43

Meter cabinet and main fuse

We replace meter cabinets and meter boards, raise and lower the main fuse and convert from single-phase to three-phase, at fixed prices. Pre-notification and completion notice (för- och färdiganmälan) to the grid operator are included in the items where the price list says so.

What the meter cabinet and the main fuse do

The meter cabinet is where the grid meets the house’s own electrical installation. It holds the electricity meter and the main fuses, and from there the cable runs on to the consumer unit. In older houses the meter is often indoors on a meter board. In newer houses it is in a cabinet in the outer wall or on a stand on the plot.

The main fuse decides how much electricity the house can use at once. Grid operators (elnätsföretag), the companies that own the local grid, not the ones you buy electricity from, also call it the meter fuse (mätarsäkring). Kraftringen writes that 16 to 25 A is enough for most homes. The size is set by a gauge piece, an insert in the fuse holder that only lets in fuses up to a certain size.

Three things are linked here:

  • The size of the main fuse. It decides both how much you can use at the same time and how large the fixed fee to the grid operator will be.
  • The number of phases. A phase is one of the grid’s three live conductors. A house with single-phase has one of them connected, a house with three-phase has all three.
  • The condition and position of the cabinet. A cramped or damaged cabinet may need to be replaced before anything else can be done.

You may not change any of this yourself. The work is electrical installation work, and the changes must be notified to the grid operator.

Replacing a meter cabinet or meter board

Replacing an existing 25 A wall-mounted meter cabinet (in the outer wall) costs SEK 10,499, or SEK 9,209 with the Swedish ROT tax deduction for labour on your home (ROT-avdrag). The price includes removal of the old cabinet, fitting of the new one, cable protection and the pre-notification and completion notice (för- och färdiganmälan). The cabinets and meter boards come from Garo.

Job Price With ROT
Replacement of wall-mounted meter cabinet 25 A, grey SEK 10,499 SEK 9,209
Replacement of meter board 25 A, indoors SEK 7,353 SEK 6,063
New flush-mounted meter cabinet in the outer wall, 25 A SEK 11,194 SEK 9,861
New free-standing meter cabinet 25 A on a ground stand SEK 23,908 SEK 22,704

The wall-mounted cabinet also comes in white, black and Falu red and in a smaller model. The cabinets for 63 A are in the price list for meter cabinets and the main fuse.

This is worth knowing before you decide:

  • A new flush-mounted meter cabinet needs space in the wall. The opening must be 71 × 54.2 cm. Up to 10 metres of underground duct is included in the price.
  • The free-standing meter cabinet has sockets for temporary power. It comes with a ground stand, a 16 A CEE socket, an ordinary socket and a residual current device (RCD) for temporary power. It is a good fit when a house is to be built.
  • Groundworks are not included. You or a groundworks contractor arrange the trench. Duct and cable in the ground may only be laid by an electrical installation company (elinstallationsföretag).
  • The grid operator decides which cabinets may be used. E.ON writes, for example, that the wall-mounted meter cabinets FM 100 and FM 125 are not approved in its grid.

Raising or lowering the main fuse

The main fuse needs to be raised when the house draws more current than the fuse can take. Kraftringen writes that main fuses that trip often can be a sign that you need a larger one. It usually shows when something big has been added, such as an EV charger (wallbox), a hot tub or a heat pump.

Change What is done Price With ROT
Between 16, 20 and 25 A Gauge pieces and fuses replaced SEK 686 SEK 505
Between 35, 50 and 63 A Gauge pieces and fuses replaced SEK 885 SEK 694
From 25 to 35 A in a wall-mounted or free-standing cabinet from Garo Fuse link replaced, when the service cable is already sized for it SEK 4,250 SEK 3,820
From 25 to 63 A Replacement and up to 10 metres of underground duct, without groundworks SEK 7,013 SEK 6,110

The service cable is the cable from the grid up to the meter cabinet. Pre-notification and completion notice are included in all four. The grid operator’s own fees are not included:

  • The fixed fee follows the fuse. Kraftringen puts it like this: the larger the fuse, the higher the fee.
  • E.ON charges no connection fee for an increase up to 25 A. If you want to go higher, you get a quote from them.
  • Neither E.ON nor Kraftringen charges for a reduction.
  • The fee does not change until the electrician has reported that the fuse has been changed.

If the reason is a charger, there is an alternative. With load balancing the charging power is lowered automatically when the house is using a lot of electricity, so that the main fuse does not trip. The articles on raising the main fuse and on load balancing help you choose.

From single-phase to three-phase

With three-phase the house can draw about three times as much power at the same fuse size. You notice it when the cooker, the heating and the car charging all have to run at the same time.

Connection Power that can be drawn at the same time
Single-phase 16 A about 3.7 kW
Three-phase 16 A about 11 kW
Three-phase 25 A about 17 kW

The figures are the number of phases times 230 V times the fuse’s current. E.ON writes that a normal 11 kW charger corresponds to a 16 A fuse on three-phase.

Converting the meter board from single-phase to three-phase costs SEK 7,660, or SEK 6,305 with ROT. The price includes replacement of the existing board, rewiring of the board, fitting and the pre-notification and completion notice. Two things fall outside it:

  • The grid operator’s fee. Kraftringen writes that it charges a fee that corresponds to its actual costs. The answer comes from the grid operator once the notification has been filed.
  • The consumer unit. A consumer unit built for single-phase may need to be rebuilt or replaced for the new phases to be of use. That is described on the page about replacing the consumer unit.

There is more about when the change pays off in the article from single-phase to three-phase.

Moving the electricity meter

Moving the electricity meter is a change to the connection and needs a pre-notification, just like a new cabinet. E.ON writes that it does not normally accept moving a meter indoors. If you want the meter out of the hall or the basement, you should therefore expect a cabinet outdoors.

The prices for a new installation then apply: SEK 11,194 for a flush-mounted 25 A meter cabinet in the outer wall or SEK 23,908 for a free-standing meter cabinet. The cable between the new cabinet and the consumer unit is priced per metre. Installation cable for 32 A costs SEK 384 per metre surface-mounted and SEK 236 per metre in underground duct.

Pre-notification and completion notice

It is the grid operator that requires the pre-notification and completion notice, not the Swedish National Electrical Safety Board, Elsäkerhetsverket. Elsäkerhetsverket itself writes that the authority no longer regulates the matter. Kraftringen writes that a pre-notification may only be filed by someone who is registered in Elsäkerhetsverket’s register. This is how it works:

  1. We file a pre-notification with your grid operator.
  2. The grid operator checks that the grid and the cable up to the house can take the change, and gives the go-ahead.
  3. We do the work.
  4. We send a completion notice.
  5. The grid operator registers the change, and your grid fee is updated.

Which grid operator you have depends on where you live. In Malmö, Burlöv, Svedala and Vellinge it is E.ON. In the town of Lund it is Kraftringen, and in Helsingborg it is Öresundskraft except in Vallåkra. What applies where you live is on the pages under electrician near you.

The ROT deduction and what the price includes

The fixed prices include materials, installation and 25 per cent VAT. A travel charge of SEK 500 is added. The prices apply to a standard installation in a place with normal access. Groundworks are not included, and neither is fault-finding in the existing installation.

The price with ROT is the price after the deduction, if you are entitled to it. In 2026 the ROT deduction is 30 per cent of the labour cost, up to SEK 50,000 per person per year. Materials and travel do not qualify. Among the things the Swedish Tax Agency, Skatteverket, counts as ROT work in houses (detached, semi-detached and terraced) are bringing in electricity and installing or adding to consumer units. In a tenant-owner flat (bostadsrätt), electrical work outdoors, or to a distribution board outside the flat, does not qualify. New builds never qualify for ROT.

LVJ-EL is registered with Elsäkerhetsverket for electrical installation work, and we are based in Malmö. Contact us with a photo of the meter cabinet and the size of your present main fuse, and we can tell you which line in the price list applies to you.

Sources

Fixed prices

Materials, installation and VAT are included. A travel charge of SEK 500 is added.

Meter cabinet and main fuse
Job Price With ROT
Garo free-standing meter cabinet 25 A – MMLK-C 1-25 TE16
SEK 23,908 SEK 22,704
Garo free-standing meter cabinet 63 A – MMLK-C 1-63 TE32
SEK 26,676 SEK 25,446
Garo wall-mounted meter cabinet 25 A, grey – GIM 1-25
SEK 11,194 SEK 9,861
Garo wall-mounted meter cabinet 63 A, grey – GIM 1-63
SEK 14,919 SEK 13,560
Garo wall-mounted cabinet 25 A, grey – GUM 1-25
SEK 10,499 SEK 9,209
Garo wall-mounted cabinet 63 A, grey – GUM 2-25
SEK 23,265 SEK 20,169

All prices for meter cabinets and main fuses

Common questions about meter cabinets and main fuses

What does it cost to replace a meter cabinet on the outside wall?

Replacing a grey 25 A wall-mounted meter cabinet from Garo costs SEK 10,499, or SEK 9,209 with ROT. The price includes removal, fitting, cable protection and the pre-notification and completion notice to the grid operator. Cabinets in white, black or Falu red and cabinets for 63 A cost more and are in the price list. A travel charge of SEK 500 is added.

How long does it take to have the main fuse raised?

That mostly depends on the grid operator. E.ON writes that the electrician can get an answer straight away for a simpler job such as raising the meter fuse (the main fuse), but that a changed connection can take between one and six months. Kraftringen handles pre-notifications in the order they come in. Get in touch in good time if the increase has to be done by a particular date.

Does the grid operator charge when the main fuse is raised?

That depends on the size. E.ON writes that it charges no connection fee for an increase up to 25 A, but that you will get a quote from them if you want to go higher. The fixed part of the grid fee is higher with a larger fuse. Our price for the change itself is a separate amount and is in the price list.

Can I lower the main fuse to get a lower grid fee?

Yes, if the house can manage on less. The fixed fee follows the size of the fuse, and neither E.ON nor Kraftringen charges for the reduction itself. Our work costs SEK 686 for a change between 16, 20 and 25 A. The risk is that the main fuse trips when a lot is running at once, so work out the house's biggest loads first.

Do I have to change to three-phase to have an EV charger?

No, not always. With single-phase and 16 A you can charge at about 3.7 kW, and Elsäkerhetsverket writes that lower charging power is often enough for the daily commute if the car charges all night. A charger that is to deliver 11 kW does, however, need three-phase and 16 A.

Can the electricity meter be moved to another place indoors?

Do not count on it. E.ON writes that it does not normally accept moving a meter indoors. A move is a change to the connection and needs a pre-notification to the grid operator, which decides what is possible. The usual alternative is a new meter cabinet in the outer wall or on the plot.

Does a new meter cabinet or a larger main fuse qualify for the green technology reduction?

No. The Swedish tax reduction for green technology (grön teknik) covers the EV charger itself and its installation. Skatteverket states explicitly that new installation, replacement or extension of a consumer unit ahead of the charger does not count. The price list instead shows a price with ROT for meter cabinets and the main fuse, if you are entitled to that deduction.

Tell us what you need help with

Describe the job and feel free to attach photos of the consumer unit and the place. We will come back with questions if needed, and then with a price.