From single-phase to three-phase: when you need it and what it costs

With three-phase, a home can use three times as much electricity at once as with single-phase on the same fuse. An electrical installation company makes the change after a pre-notification (föranmälan) to the grid operator. Changing the meter board costs SEK 7,660 with us, or SEK 6,305 with ROT. The grid operator's fee is added.

With three-phase, your home can use three times as much electricity at once as with single-phase on the same fuse. You notice it when you want to charge an electric car (EV) at 11 kW, connect a machine that requires three phases, or when the single main fuse trips time after time. The change is made by an electrical installation company (elinstallationsföretag) after a pre-notification (föranmälan), a notice the company files with the grid operator before the work starts. The grid operator (elnätsföretag) is the company that owns the local grid, not the company you buy electricity from. Changing the meter board from single-phase to three-phase costs SEK 7,660 with us, or SEK 6,305 with the Swedish ROT tax deduction for labour on your home (ROT-avdrag). The grid operator’s fee is added, and sometimes the consumer unit has to be replaced as well.

The difference between single-phase and three-phase

A phase is a current-carrying conductor. With single-phase, one phase conductor and one neutral come into the home, and the voltage between them is 230 V. The neutral is the conductor that carries the current back. With three-phase, three phase conductors and one neutral come in. There is 230 V between each phase and the neutral, and 400 V between two phases.

The power you can draw is the number of phases times 230 V times the current rating of the fuse.

Property Single-phase Three-phase
Phase conductors into the home One Three
Voltage 230 V 230 V and 400 V
Power available at once at 16 A approx. 3.7 kW approx. 11 kW
Power available at once at 25 A approx. 5.8 kW approx. 17.3 kW
Charging an electric car at 16 A approx. 3.7 kW approx. 11 kW
Sockets and machines for 400 V No Yes

Ordinary sockets and lights work the same way in both cases. They use one phase and the neutral.

How to see what you have

  • Count the main fuses. The main fuse sits before the electricity meter, in the meter cabinet or on the meter board. One fuse means single-phase. Three mean three-phase.
  • Look at the sockets. A round socket with five holes, or a cooker outlet for three phases, is only found where there is three-phase.
  • Ask the grid operator. They know what your connection looks like. E.ON writes in its price list that single-phase connections are charged as 16 A.

Single-phase is found mainly in older flats, holiday homes and small older houses.

When you need three-phase, and when you can manage without

You need three-phase when:

  • you want to charge the car at 11 kW. E.ON writes that a normal EV charger (wallbox) charges at 11 kW on three phases, which corresponds to a 16 A fuse
  • you want a three-phase socket for a machine, a log splitter or a welder
  • you are connecting equipment that the manufacturer has made for three phases, for example certain heat pumps and hot tubs
  • the main fuse trips even though you have already spread out your use.

You can often manage without when the car is the only reason. On one phase at 16 A a charger gives roughly 3.7 kW, which is around 37 kWh in ten hours. The Swedish National Electrical Safety Board, Elsäkerhetsverket, writes in its advice on planning your charge point that high power is often unnecessary, and that lower charging power goes a long way for anyone who can charge all night. Compare with how far you drive per day before you decide.

How the change is done

It is the grid operator that requires the pre-notification and completion notice (för- och färdiganmälan), and it is the electrical installation company that submits them. Kraftringen Nät writes on its page about changes to an existing installation that anyone who wants to go from single-phase to three-phase engages an electrical installer, who in turn sends in a pre-notification.

  1. Review on site. We look at what is there: the meter board or meter cabinet, the cable in to the consumer unit and the unit itself.
  2. Pre-notification. We notify your grid operator of the change.
  3. The grid operator’s answer. The grid operator reviews its part, for example the cable up to the house and the meter, and comes back with what applies.
  4. The meter board is replaced. The new board is wired for three phases.
  5. The consumer unit is adapted. The unit gets a main switch for three phases, and the circuits are spread across the phases so that the load is even. A circuit is the sockets and lights that share one fuse.
  6. Inspection and completion notice. We inspect and test the installation and report that it is finished, and the grid operator connects it.

Expect a wait at the grid operator. E.ON writes in general terms about changes to an existing connection that they can take between one and six months, and in isolated cases longer. We have no verified information on how E.ON handles the change from single-phase to three-phase specifically, so ask in your own case.

What it costs

Item in the price list Price With ROT
Garo meter board, change from single-phase to three-phase SEK 7,660 SEK 6,305
Consumer unit 1×13, Hager Gamma SEK 5,810 SEK 4,780
Main switch, 3-pole SEK 609 SEK 426
Circuit breaker, 3-pole SEK 516 SEK 361
Installation cable 32 A, surface-mounted, per metre SEK 384 SEK 341

The prices include materials, installation and VAT. The meter board item also includes rewiring of the board and the pre-notification and completion notice. A travel charge of SEK 500 is added, and the prices apply to a standard installation.

Three things decide what the final sum will be:

  • The consumer unit. A unit built for one phase often lacks both the space and the main switch for three. It is then replaced at the same time.
  • The cable between the meter and the consumer unit. Three phases need more conductors. If there are only conductors for one phase, a new cable is run.
  • The grid operator’s fee. Kraftringen Nät writes that you pay a fee that corresponds to their actual costs. We have no verified information on what other grid operators charge, so we state no amounts. Ask your grid operator, or let us do it when the pre-notification is sent in.

The price list shows the price with ROT, and the conditions for the deduction can vary. The fixed grid fee follows the size of the fuse. There is no longer any requirement for a capacity charge (effektavgift), since that requirement was removed in 2026.

Flats and tenant-owner flats

In a block of flats, the cables up to the flat’s consumer unit run through the building. Under the Swedish Tenant-Ownership Act (bostadsrättslagen), the tenant-owner is not responsible for electricity cables that the tenant-owner association (bostadsrättsförening) has provided the flat with and that serve more than one flat. Elsäkerhetsverket writes that the association’s responsibility usually ends at the flat’s consumer unit, but that the association’s statutes (stadgar) may say otherwise.

A change to three-phase therefore affects the association’s part of the installation. Talk to the board before you order anything. In a rented flat it is the property owner who decides. More about where the boundaries lie is in the article on electricity in a tenant-owner flat (bostadsrätt).

When to get in touch

Get in touch when you know what you want to be able to do with your electricity: charge at 11 kW, get a three-phase socket or stop the main fuse tripping. We look over the meter board and consumer unit and tell you whether the change is needed or whether something smaller will do. There is more on the page about meter cabinets and main fuses, and the amounts are in the price list for meter cabinets and main fuses. If the fuse only needs to be larger, there is the article on raising the main fuse.

Sources

Common questions

What does it cost to change from single-phase to three-phase?

Changing the meter board from single-phase to three-phase costs SEK 7,660 with us, or SEK 6,305 with ROT. Rewiring of the board, fitting, pre-notification and completion notice (för- och färdiganmälan) and VAT are included, and a travel charge of SEK 500 is added. On top of that come the grid operator's fee and often a new consumer unit. A 1×13 consumer unit costs SEK 5,810.

How can I tell whether I have single-phase or three-phase?

Count the main fuses in the meter cabinet or on the meter board. One fuse means single-phase and three mean three-phase. Another sign is the sockets: a round socket with five holes, or a cooker outlet for three phases, is only found where there is three-phase. If you are unsure, the grid operator can tell you.

Is single-phase enough if all I want is to charge my electric car?

Often, yes. On one phase at 16 A an EV charger gives roughly 3.7 kW, and Elsäkerhetsverket writes that lower charging power is often enough for the daily commute if the car can charge all night. If you want to charge at 11 kW you need three-phase. At E.ON that corresponds to a 16 A fuse.

Does the consumer unit have to be replaced when the house gets three-phase?

Often, but not always. The consumer unit needs a main switch for three phases and room for circuits on all three. An old unit built for one phase seldom has that. A 1×13 consumer unit from Hager costs SEK 5,810 with us, or SEK 4,780 with ROT.

Who files the notification with the grid operator when changing to three-phase?

The electrical installation company. Kraftringen Nät writes that you engage an electrical installer, who submits a pre-notification to the grid operator. It is the grid operator, not Elsäkerhetsverket, that requires the notification. Our price for changing the meter board includes both the pre-notification and the completion notice.

Can you get three-phase in a flat?

It depends on the building and on the tenant-owner association or the property owner. The cables up to the flat's consumer unit normally belong to their part of the installation, so the change is not something you can order on your own. Start by asking the board or the landlord whether three-phase has been run in the building and what the association's statutes say.