Electrical installation for building contractors and developers

We do the electrical installation for building contractors and developers, as a subcontractor or directly for the client. This page covers what applies to temporary site power (byggström), the notifications to the grid operator, inspection and documentation, and what we need to price a project.

Building under construction at night, with a crane and lit floors

What we do in a building project

LVJ-EL does electrical installations in new homes and premises and in conversions. You can engage us as the electrical subcontractor, or directly if you are the developer. We are based in Malmö and work in Malmö and the rest of Skåne.

The electrical work follows the build in five steps:

  1. Temporary site power (byggström). A pre-notification (föranmälan) is filed with the grid operator, and a cabinet with sockets for temporary power is set up. The grid operator (elnätsföretag) is the company that owns the local grid, not the company you buy electricity from.
  2. Conduit and boxes. Conduits and boxes are placed in walls and floor structures before these are closed up or cast.
  3. Cables and boards. The cables are pulled, and meter cabinets and distribution boards are fitted. The meter cabinet holds the electricity meter and the main fuses, which decide how much electricity the building can use at the same time.
  4. Fitting. Sockets, switches, light fittings and permanently connected machines are connected.
  5. Inspection and handover. The installation is inspected and tested before it is put into use, the completion notice (färdiganmälan) is filed and the installation is documented.

Data, networking, controls and charging spaces can be wired at the same stage. The services are described on the pages electrics in new builds and electrics when renovating.

Site power and temporary electricity

Site power is ordered with a pre-notification to the grid operator, and it is the electrical installation company (elinstallationsföretag) that files it, before the work starts.

Start in good time. Kraftringen Nät is one example. There it is called a temporary connection (tillfällig anslutning), and the customer and the electrical installer arrange the site power cabinet, the service cable (the cable from the grid to the cabinet) and the conduit themselves. Pre-notifications are handled in the order they arrive, and the completion notice must be in no later than 14 days before the requested connection date. Other grid operators have their own terms, and we check what applies at your address.

Two items in the price list concern temporary power:

  • A free-standing meter cabinet from Garo rated 25 A costs SEK 23,908. The price includes the ground stand, sockets of the CEE 16 A and Schuko 16 A types, a residual current device (RCD) for temporary power, the pre-notification and completion notice, and up to 10 metres of underground duct. The 63 A cabinet, with socket type CEE 32 A, costs SEK 26,676.
  • Pre-notification and completion notice for a temporary installation, with fitting of gauge pieces and inspection, costs SEK 666. The gauge piece is the insert that determines the size of the fuse.

The amounts include VAT. Groundworks are not included, and a travel charge of SEK 500 is added. There are more items in the price list for meter cabinets and main fuses.

A temporary installation must be as safe as a permanent one. The Swedish National Electrical Safety Board, Elsäkerhetsverket, points out in particular that the cables must be protected from site vehicles and machinery. Also decide who is the holder of the temporary installation (innehavare), the owner or user who is responsible for it. Otherwise the responsibility easily becomes unclear on a site with several companies. The rules are on Elsäkerhetsverket’s page on temporary electrical installations, and the process is described in the article on site power.

Who may do the electrical work, and who is responsible for what?

Electrical installations in new construction may only be carried out by registered electrical installation companies. A main contractor that buys in the electrical work does not count as an electrical installation company and is not in Elsäkerhetsverket’s register. So it is the subcontractor you should check in Elsäkerhetsverket’s register search Kolla elföretaget (“check the electrical company”). For residential buildings the registration must cover the activity type “Bostäder” (dwellings). LVJ-EL is registered for, among other things, dwellings, public and commercial premises such as offices, shops, restaurants and schools, and charging stations for electric cars.

Task Who
Pre-notification and completion notice to the grid operator The electrical installation company
Connection to the grid The grid operator
Digging the trench The builder or the groundworks contractor
Laying underground power cable and the conduit for it The electrical installation company
Inspection and testing before the installation is put into use, labelling and documentation The electrical installation company
Continuous checks once the installation is in operation The holder of the installation

Rules for how the work is done in new homes

The installation must be constructed in accordance with good electrical safety practice. The requirement is in Elsäkerhetsverket’s regulations ELSÄK-FS 2022:1. Anyone who follows the Swedish standard, the Swedish wiring rules (Elinstallationsreglerna, SS 436 40 00), is considered to meet the requirement unless something else is shown. If the work departs from the standard, the assessment must be documented.

This already shows at the design stage:

  • Today’s rules require RCDs as additional protection for practically all sockets in new homes. An RCD cuts the power when current leaks to earth.
  • In bathrooms every circuit must be protected by a 30 mA RCD. A circuit is the sockets and lights that share one fuse.
  • Ceiling lighting outlets are fitted as DCL outlets (the plug-in outlet for a light fitting), which are standard in installations made after 1 April 2019.
  • Sockets must have child-proof shutters or be placed so that the risk of accidents involving children is limited.

Inspection and documentation at handover

Before a new installation is put into use it must be inspected and tested. The electrical installation company must also label and document the parts covered by the work. At every distribution board there must be an up-to-date circuit chart, that is, a list showing what each fuse supplies.

The legal requirement covers the labelling and documentation needed for operation and maintenance. There is no requirement for any particular certificates. If you want more, for example as-built drawings or the records from the inspection and testing, it should be stated in the contract. Once the installation has been put into use, responsibility passes to the holder.

Tax deductions and consumer rules

  • New construction never qualifies for the Swedish ROT tax deduction for labour on your home (ROT-avdrag), and in houses less than five years old the deduction is limited.
  • A private individual who builds a house (detached, semi-detached or terraced) can get the Swedish tax reduction for green technology (grön teknik) for an EV charger (wallbox) even while the house is under construction. A Zaptec Go rated 11 kW costs SEK 11,096 with installation, or SEK 5,548 with grön teknik.
  • Companies get neither of the deductions.
  • The Swedish Consumer Services Act (konsumenttjänstlagen) only applies when the customer is a consumer. Between companies it is the contract that governs.

What we need to price the job

The electrical installation in a building project has no fixed price. Send us:

  • floor plans, and electrical drawings if there are any
  • the number of homes or premises and what they will be used for
  • the heating system, the main fuse you want and the number of charging spaces
  • the schedule and who is doing the groundworks
  • the address, so that we know which grid operator applies

The price depends on the floor area, the number of sockets and light fittings, the building’s frame and how the conduits can be run, and how much control equipment and networking is included. You get a quote that states what is included. Send the documents via contact and quote.

Sources

Common questions: construction projects

Can you take on the electrical work as a subcontractor in a building project?

Yes. We do electrical installations for building contractors and developers in Malmö and the rest of Skåne, in both homes and premises. We are registered with Elsäkerhetsverket for, among other things, dwellings and public and commercial premises. Send us the drawings and the schedule, and you will get a quote that states what is included.

Who orders site power, and how long does it take?

The electrical installation company orders it with a pre-notification to the grid operator. How long it takes depends on the grid operator. Kraftringen Nät, for example, wants the completion notice (färdiganmälan) no later than 14 days before the requested connection date and handles pre-notifications in the order they arrive. Get in touch well before work starts on site.

Does the main contractor have to be registered with Elsäkerhetsverket?

No. According to Elsäkerhetsverket, a main contractor that buys in the electrical installation does not count as an electrical installation company and is not in the register. The company that carries out the electrical work, on the other hand, must be registered, and for residential buildings the registration must cover the activity type “Bostäder” (dwellings). You can see this in Elsäkerhetsverket's register search Kolla elföretaget (“check the electrical company”).

What documentation do we get when the electrical installation is finished?

The law requires the labelling and documentation needed for operation and maintenance, and an up-to-date circuit chart at every distribution board. The installation must also be inspected and tested before it is put into use. The law does not require any particular certificates, so anything you want beyond that should be written into the contract.

Does electrical installation in a newly built house qualify for the ROT deduction?

No. According to the Swedish Tax Agency, Skatteverket, you can never get the ROT deduction for building an entirely new home. In houses less than five years old the deduction is also limited. A private individual who builds a house can, however, be entitled to the Swedish tax reduction for green technology (grön teknik) when an EV charger is installed.

What does the electrical installation in a new build cost?

There is no fixed price for a complete electrical installation. The price depends on the floor area, the number of sockets and light fittings, the building's frame and how the conduits can be run, and how much control equipment and networking is included. Individual parts have a fixed price, for example a free-standing 25 A meter cabinet for SEK 23,908. You get a quote based on the drawings.

May the groundworks contractor lay the electrical conduits in the trench?

No, not the conduits for power cable. According to Elsäkerhetsverket, underground power cables and the conduits for them may only be laid by a person covered by an electrical installation company's self-inspection programme (egenkontrollprogram, the routines the company has for making sure the work follows the rules and is checked). The groundworks contractor can dig the trench itself. Check first in Ledningskollen where existing cables and pipes run.

Tell us what you need help with

Describe the job and feel free to attach photos of the consumer unit and the place. We will come back with questions if needed, and then with a price.