- Our base
- We are based in Malmö
- Places we work in include
- Malmö, Bunkeflostrand, Oxie, Tygelsjö, Skumparp
- Grid operator
- E.ON
Four out of five homes are flats
Malmö had 368,994 inhabitants on 30 September 2026 and 175,845 homes in 2025, according to Statistics Sweden (SCB). Of those homes, 143,803 were in blocks of flats, which is 81.8 per cent, and 28,201 in houses (detached, semi-detached and terraced). The flats in the blocks of flats are almost evenly divided between 73,954 rented flats and 69,749 tenant-owner flats (bostadsrätt).
The form of tenure decides who orders electrical work:
- Rented flat. In most cases it is the property owner or landlord who is responsible for the electrical installation, according to the Swedish National Electrical Safety Board, Elsäkerhetsverket. Start there.
- Tenant-owner flat. You are normally responsible for the electrics from the flat’s consumer unit inwards, but the statutes (stadgar) of the tenant-owner association (bostadsrättsförening) decide.
- Your own house. You own the installation and are responsible for all of it.
Tenant-owner flats and the association’s statutes
Elsäkerhetsverket describes the usual dividing line like this: the association’s responsibility tends to end at the flat’s consumer unit, and there the tenant-owner takes over. The statutes may say something else. Elsäkerhetsverket’s page on electrics in a tenant-owner flat urges you always to check them, and our article on electrics in a tenant-owner flat goes through where the line is drawn.
Inside the flat, common jobs have a fixed price. A new consumer unit with one row, Hager Gamma 1×13, costs SEK 5,810 with materials, installation and VAT. With the Swedish ROT tax deduction for labour on your home (ROT-avdrag) the price is SEK 4,780. In a tenant-owner flat, electrical work qualifies for the ROT deduction if it is done inside the flat and you are responsible for it under the statutes. There are more jobs on the page for electricians in flats and tenant-owner flats.
The year of construction says a lot about the electrics
| Year of construction | Flats in blocks of flats | Homes in houses |
|---|---|---|
| Before 1941 | 26,872 | 5,736 |
| 1941–1960 | 34,481 | 3,504 |
| 1961–1980 | 43,751 | 9,120 |
| 1981–2010 | 14,527 | 7,659 |
| 2011 or later | 23,813 | 2,161 |
The figures are SCB’s for 2025. The single biggest decade is 1961–1970, for both blocks of flats (26,977 flats) and houses (4,831 homes).
Earthed sockets became a requirement in new installations in 1994, and residual current devices (RCDs) became a requirement in new homes in 2000. An RCD cuts the power when current leaks to earth. Just over three in four flats in Malmö’s blocks of flats are in buildings older than both requirements. If the electrics have not been rebuilt since the building was new, the flat may have unearthed sockets outside the kitchen and a consumer unit without an RCD.
None of it has to be replaced. An older installation in good condition may stay, and there is no requirement to fit an RCD afterwards, although Elsäkerhetsverket recommends it. But earthed and unearthed sockets must not be mixed in the same room, so anyone who changes them does it room by room. Changing from an unearthed to an earthed socket costs SEK 881 per socket with up to 10 metres of new cable, or SEK 617 with ROT. If the kitchen is to be rebuilt, the planning is covered in the article on electrics in the kitchen, and ceilings and lighting in the article on installing spotlights.
Detached and terraced houses
Of the houses, 24,393 are owner-occupied (äganderätt). One in five homes in houses is in a building from before 1941, and one in three in a house from 1961–1980. Elsäkerhetsverket recommends an electrical inspection when you buy an older house, especially if it was built before 1970. What we do in houses, from a new consumer unit to an EV charger (wallbox), is on the page for electricians in detached and terraced houses.
One grid operator for the whole city
E.ON Energidistribution owns the grid in practically the whole of Malmö, which makes it the grid operator (elnätsföretag) here: the company that owns the local grid, not the company you buy electricity from. Centrum, Västra Hamnen, Limhamn, Hyllie, Fosie, Rosengård, Kirseberg, Husie, Bunkeflostrand, Oxie and Tygelsjö are all in the grid area Malmö-Burlöv. That makes the notifications easy to predict:
- EV charger. E.ON requires no pre-notification (föranmälan) as long as the electrical installation is otherwise left unchanged, whatever the size of the charger.
- Main fuse. A change of fuse size is always notified. The main fuse decides how much electricity the home can use at the same time.
- New meter cabinet. This counts as a change to the installation and is pre-notified. The meter cabinet holds the electricity meter and the main fuses.
We file the notification when it is required: a pre-notification to E.ON before the work is done and a completion notice (färdiganmälan) when it is finished. The price list items for meter cabinets and main fuses say when the pre-notification and completion notice are included.
Booking an electrician in Malmö
We are based in Malmö and take on work in the whole municipality, in flats, houses and premises. Besides the city itself, the municipality has the built-up areas of Bunkeflostrand with 15,572 inhabitants, Oxie with 14,430, Tygelsjö with 4,356 and Skumparp with 236. LVJ-EL is registered with Elsäkerhetsverket, and you can check that yourself in its register search Kolla elföretaget (“check the electrical company”). A travel charge of SEK 500 is added, and the fixed prices apply to standard installations. We also work in the neighbouring municipalities, and the overview is on the page electricians town by town.