| Job | Price | With ROT |
|---|---|---|
Garo free-standing meter cabinet 25 A – MMLK-C 1-25 TE16 New installation. IP44, 25 A. Incl. stand, CEE 16 A, Schuko 16 A, RCD for temporary power, pre-notification and completion notice (för- och färdiganmälan), up to 10 m of underground duct. Groundworks not included. | SEK 23,908 | SEK 22,704 |
Garo free-standing meter cabinet 63 A – MMLK-C 1-63 TE32 New installation. IP44, 63 A. Incl. stand, CEE 32 A, Schuko 16 A, RCD for temporary power, up to 10 m of underground duct. Groundworks not included. | SEK 26,676 | SEK 25,446 |
Garo wall-mounted meter cabinet 25 A, grey – GIM 1-25 New installation. IP23, 25 A, 18 modules. Pre-notification and completion notice (för- och färdiganmälan), up to 10 m of underground duct. Requires a recess of 71 × 54.2 cm. | SEK 11,194 | SEK 9,861 |
Garo wall-mounted meter cabinet 63 A, grey – GIM 1-63 New installation. IP23, 63 A, 18 modules. Same installation as GIM 1-25. | SEK 14,919 | SEK 13,560 |
Garo wall-mounted cabinet 25 A, grey – GUM 1-25 Replacement of the existing cabinet. IP23, 25 A, 18 modules. Removal, fitting, 2 cable guards, pre-notification and completion notice (för- och färdiganmälan). | SEK 10,499 | SEK 9,209 |
Garo wall-mounted cabinet 63 A, grey – GUM 2-25 Replacement of the existing cabinet. IP23, 63 A, 2 × 18 modules. Removal, fitting, 4 cable guards, pre-notification and completion notice (för- och färdiganmälan). | SEK 23,265 | SEK 20,169 |
Garo wall-mounted cabinet 25 A, grey, small – GUM-L 1-25 Replacement of the existing cabinet. IP23, 25 A, 8 modules. | SEK 10,281 | SEK 8,991 |
Garo wall-mounted cabinet 25 A, white – GUM 1-25 Replacement of the existing cabinet. IP23, 25 A, 18 modules. | SEK 11,911 | SEK 10,621 |
Garo wall-mounted cabinet 25 A, black – GUM 1-25 Replacement of the existing cabinet. IP23, 25 A, 18 modules. | SEK 12,084 | SEK 10,794 |
Garo wall-mounted cabinet 25 A, Falu red – GUM 1-25 Replacement of the existing cabinet. IP23, 25 A, 18 modules. | SEK 11,879 | SEK 10,589 |
Garo wall-mounted cabinet 63 A, grey – GUM 1-63 Replacement of the existing cabinet. IP23, 63 A, 18 modules. | SEK 14,865 | SEK 13,519 |
Garo meter board 25 A, white – MT 233-1 Replacement of the existing board. IP20, 25 A. Removal, fitting, pre-notification and completion notice (för- och färdiganmälan). | SEK 7,353 | SEK 6,063 |
Garo meter board, single-phase to three-phase Replacement of the existing single-phase board with a three-phase board. Rewiring of the board, fitting, pre-notification and completion notice (för- och färdiganmälan). | SEK 7,660 | SEK 6,305 |
Installation cable 32 A, surface-mounted, per metre – Draka Aceflex 5G6 Price per metre. Groundworks not included. | SEK 384 | SEK 341 |
Installation cable 32 A in 50 mm underground duct, per metre – Draka Aceflex 5G6 Price per metre incl. yellow 50 mm underground duct. Groundworks not included. | SEK 236 | SEK 214 |
Raising the main fuse from 25 A to 35 A – Garo wall-mounted or free-standing cabinet Replacement of the fuse link. The service cable is dimensioned for it. Pre-notification and completion notice (för- och färdiganmälan) included. | SEK 4,250 | SEK 3,820 |
Raising the main fuse from 25 A to 63 A – incl. underground duct Replacement plus up to 10 m of 110 mm underground duct. Groundworks not included. Pre-notification and completion notice (för- och färdiganmälan) included. | SEK 7,013 | SEK 6,110 |
Raising or lowering the main fuse, 35 A/50 A/63 A – notification to the grid operator included Replacement of gauge pieces and fuses. Pre-notification and completion notice (för- och färdiganmälan) included. | SEK 885 | SEK 694 |
Raising or lowering the main fuse, 16 A/20 A/25 A – notification to the grid operator included Replacement of gauge pieces and fuses. Pre-notification and completion notice (för- och färdiganmälan) included. | SEK 686 | SEK 505 |
Temporary installation – site power (byggström) Meter positions in blocks of flats. Pre-notification and completion notice (för- och färdiganmälan) 16 A–63 A, fitting of gauge pieces, checks. | SEK 666 | SEK 499 |
New installation – new subscriber Meter positions in blocks of flats. Pre-notification and completion notice (för- och färdiganmälan) 16 A–63 A, fitting of gauge pieces, checks. | SEK 666 | SEK 499 |
All prices are in Swedish kronor (SEK) including 25 per cent VAT, materials and installation. A travel charge of SEK 500 is added. The price with ROT is the price after the deduction, if you are a private individual and are entitled to it.
Replacing a meter cabinet costs SEK 10,499 for a 25 A wall-mounted cabinet from Garo, or SEK 9,209 with the Swedish ROT tax deduction for labour on your home (ROT-avdrag). Raising the main fuse costs SEK 686 within 16 to 25 A and SEK 4,250 from 25 A to 35 A. Going from single-phase to three-phase costs SEK 7,660. The line for temporary site power (byggström) costs SEK 666. Materials, installation and 25 per cent VAT are included, and a travel charge of SEK 500 is added.
Free-standing cabinet, wall-mounted cabinet or meter board
The lines differ in where the electricity meter sits and whether the cabinet is new or a replacement. A meter cabinet is the cabinet that holds the electricity meter and the main fuses.
- Free-standing meter cabinets stand on their own on a ground stand. The lines are for new installation and cost SEK 23,908 for 25 A and SEK 26,676 for 63 A. The cabinets have sockets and a residual current device (RCD) for temporary power, so they can be used during the build itself.
- Wall-mounted meter cabinet as a new installation costs SEK 11,194 for 25 A. The cabinet is recessed into the outer wall, and the list states that a recess of 71 × 54.2 cm is needed.
- Wall-mounted cabinet as a replacement costs SEK 10,499 for a grey 25 A cabinet with 18 modules. Removal, fitting, two cable guards and notification are included. White, black and Falu red cost more.
- Meter board is rated IP20 and is therefore made to sit indoors. Replacement costs SEK 7,353.
Raising or lowering the main fuse
The price depends on which sizes you change between. The main fuse determines how much electricity you can use at the same time, and the size is set by a gauge piece (the insert that limits the fuse size) in the fuse holder.
| Change | Price | What the line covers according to the list |
|---|---|---|
| Within 16, 20 and 25 A | SEK 686 | Replacement of gauge pieces and fuses |
| Within 35, 50 and 63 A | SEK 885 | Replacement of gauge pieces and fuses |
| From 25 A to 35 A in a wall-mounted or free-standing cabinet from Garo | SEK 4,250 | Replacement of the fuse link. The service cable must already be sized for it. |
| From 25 A to 63 A | SEK 7,013 | The change and up to 10 metres of 110 mm underground duct |
The service cable is the cable that runs from the grid to the meter cabinet. Pre-notification and completion notice (för- och färdiganmälan) are included in all four lines: one notice before the work is done and one when it is finished, both to the grid operator (elnätsföretag), the company that owns the local grid, not the company you buy electricity from. An example: raising from 25 A to 35 A for SEK 4,250 and the travel charge of SEK 500 come to SEK 4,750 in total.
The grid operator may charge fees of its own. E.ON writes that there is no connection fee for raising up to 25 A, but that you get a quote for the connection fee if you want to go higher. The fixed grid fee follows the size of the fuse. When a larger fuse is needed is explained in the article on raising the main fuse.
From single-phase to three-phase
The change costs SEK 7,660, or SEK 6,305 with ROT. The line covers replacement of the existing meter board, with rewiring of the board, fitting, and pre-notification and completion notice. A phase is one of the conductors that carry current into the house. With three phases the house can use more electricity at the same time, and three-phase appliances can be connected.
The grid operator may charge a fee of its own for the change. Kraftringen writes that the fee corresponds to its actual costs. If the consumer unit in the house is to be replaced as well, the prices are in the price list for consumer units. More about the change is in the article from single-phase to three-phase.
Groundworks, cable and notification
Groundworks are not included in any line. Otherwise this is what applies:
- Digging. You arrange the trench yourself or with a groundworks contractor. Cable and cable duct in the ground, on the other hand, may only be laid by an electrical installation company (elinstallationsföretag), according to the Swedish National Electrical Safety Board, Elsäkerhetsverket.
- Cable. Installation cable for 32 A costs SEK 236 per metre in underground duct and SEK 384 per metre surface-mounted.
- Notification. Pre-notification and completion notice are included in the lines where the list says so. It is the grid operator that requires the notification, and the electrical installation company files it.
- Time. E.ON writes that a changed connection can take between one and six months, but that the electrician can get an answer straight away for simpler jobs such as a larger meter fuse (the main fuse).
The site power line applies to meter positions in blocks of flats: pre-notification and completion notice, fitting of gauge pieces and checks. How power for a building site is arranged is in the article on site power.
The price with ROT applies if you are entitled to the deduction. New builds do not qualify for the ROT deduction, so if you are building new, it is the price without ROT that applies.
What applies to the prices
- A standard installation in a place that is accessible
- The existing cable route can be used
- The prices apply to standard installations under the conditions above.
- Extra work may be added if the existing electrical installation has faults.
- Fault-finding in the existing electrical installation is included only where this is expressly stated.
- Prices are shown including 25 per cent VAT.
- A travel charge of SEK 500 is added. Charges for driving to the site or setting up on site may be added.
- The ROT deduction (the Swedish tax deduction for labour on your home) applies to private individuals and work in the home. The conditions vary, so ask us if you are unsure.
How the work is done is described on the page about meter cabinets and main fuses.