- From us in Malmö
- 30 km, about 28 min by car
- Places we work in include
- Kävlinge, Löddeköpinge, Furulund, Hofterup, Barsebäck, Dösjebro
- Grid operator
- Skånska Energi, E.ON and Kraftringen
An EV charger at home in Kävlinge municipality
Seven in ten homes in Kävlinge municipality are in houses (detached, semi-detached and terraced), and 7,832 of those houses are owner-occupied (äganderätt), according to Statistics Sweden (SCB). If you own your home, you decide on the charging yourself and may be entitled to the Swedish tax reduction for green technology (grön teknik): 50 per cent of the cost of labour and materials, up to SEK 50,000 per person per year according to the Swedish Tax Agency, Skatteverket.
An 11 kW Zaptec Go costs SEK 11,096 with installation, cable and commissioning. With grön teknik the price is SEK 5,548. Load balancing with Zaptec Sense costs SEK 928 or SEK 948, depending on which customer port the electricity meter has. Load balancing means that the charging power is lowered automatically when the house is using a lot of electricity, so that the main fuse does not trip.
Neither of the municipality’s two large grid owners requires a pre-notification (föranmälan, a notice the electrical installation company files with the grid owner before the work is done) for the EV charger (wallbox) itself:
- Skånska Energi Nät writes that it currently has no requirement for pre-notification when EV chargers or hot tubs are installed.
- E.ON requires no pre-notification as long as you change nothing else in the installation. A change of fuse size and a new meter cabinet, the cabinet that holds the electricity meter and the main fuses, are E.ON’s own examples of changes that must be notified.
The charger must have its own residual current device (RCD), which cuts the power if current leaks to earth, and must not be connected downstream of the house’s existing RCD. There is more about the installation on the page about EV chargers, and every item is listed under EV chargers in the price list.
West and east are on different grids
| Grid operator (elnätsföretag) | Towns and villages |
|---|---|
| Skånska Energi Nät | Kävlinge, Furulund, Lilla Harrie |
| E.ON Energidistribution | Löddeköpinge, Hofterup, Sandskogen, Barsebäck, Barsebäckshamn, Dösjebro |
Skånska Energi has 7,400 subscriptions in the municipality, just over a third of all the company has. Kraftringen has a handful of customers here. Around Västra Karaby the boundary between the grid areas runs close to the village, and the boundaries do not follow the built-up areas. Your grid operator is the company that owns the local grid, not the company you buy electricity from, and its name is on the bill it sends you.
Hot tubs, pools and pumps
What Skånska Energi says also covers hot tubs: no pre-notification at present. With E.ON the basic rule is that an extension that requires a larger meter fuse, the company’s word for the main fuse, or that gives a substantial increase in power, must be pre-notified.
Connecting a hot tub costs SEK 6,966 in the price list, with a local isolator switch and an RCD. The isolator switch sits next to the equipment and cuts the power during servicing. Connecting a pool with pump and heat pump costs SEK 10,302, with an IP65 distribution board, cabling and a local isolator switch. The price list also shows the price with the Swedish ROT tax deduction for labour on your home (ROT-avdrag), but the conditions for the deduction can vary. Every item is listed under pools, hot tubs and pumps.
When the main fuse is not enough
The main fuse decides how much electricity the house can use at the same time. If it is to be raised or lowered, we always file a notification with the grid operator, whether that is Skånska Energi or E.ON. Changing between 16, 20 and 25 A costs SEK 686 with pre-notification and completion notice (för- och färdiganmälan). With load balancing you do not always need a larger fuse just because you are getting an EV charger.
Houses and flats from the 1970s
Kävlinge is the only one of the twelve municipalities we have pages for where 1971–1980 is the biggest building period for both houses and blocks of flats: 1,828 homes in houses and 851 flats. The buildings from those years went up before earthed sockets became a requirement in new installations in 1994 and before RCDs became a requirement in new homes in 2000. That is not a fault in itself, but it is good to know before a renovation.
The municipality also has 1,189 houses held as tenant-owner homes (bostadsrätt). There the statutes (stadgar) of the tenant-owner association (bostadsrättsförening) decide who is responsible for what.
From Malmö to Kävlinge
We are based in Malmö. Kävlinge station is 29.6 kilometres away, about 28 minutes by car without traffic. A travel charge of SEK 500 is added to the prices in the price list. LVJ-EL is registered with the Swedish National Electrical Safety Board, Elsäkerhetsverket, for dwellings and charging stations for electric cars, among other things. The other towns are in the overview of where we work as electricians.