- From us in Malmö
- 33 km, about 34 min by car
- Places we work in include
- Trelleborg, Anderslöv, Skegrie, Beddingestrand, Smygehamn, Kurland
- Grid operator
- Trelleborgs Elnät and E.ON
Two grid operators share the municipality
According to Trelleborgs Elnät AB, the company owns the grid “in and around the town of Trelleborg”. It is a subsidiary of the municipally owned Trelleborgs Energi. The rest of the municipality belongs to E.ON Energidistribution. Both are grid operators (elnätsföretag), meaning the company that owns the local grid, not the company you buy electricity from.
| Place | Grid operator according to the map of grid areas |
|---|---|
| Trelleborg, Kurland, Västra Tommarp, Gislövs läge | Trelleborgs Elnät |
| Anderslöv, Klagstorp, Alstad | E.ON |
| Skegrie, Beddingestrand, Smygehamn | The boundary runs close to the village. See the bill from your grid operator |
The boundaries follow neither the built-up areas nor the municipal boundary, and the map shows where the centre of each place lies, not every address. The certain answer is on the bill from your grid operator.
What Trelleborgs Elnät wants notified
Trelleborgs Energi writes that the electrical installer must send a written pre-notification (föranmälan) before the work starts when the job is a new connection, a changed connection or a substantial change to the installation. A changed main fuse is the company’s own example. The main fuses are the fuses where the electricity enters the house. The completion notice (färdiganmälan) must reach the company no later than two weeks before connection. The rules are on the company’s page about pre-notification and completion notice.
For an EV charger (wallbox) the answer is not clear-cut. The company lists a permanently connected charger among the jobs that require an electrical installation company (elinstallationsföretag) and then writes that a pre-notification must be sent “in such cases”. We therefore ask the company before we fit a charger in its grid. E.ON requires no pre-notification for a charger as long as the installation is otherwise unchanged.
A job that has to be notified goes like this:
- You describe the job. Photos of the consumer unit and the meter cabinet, the cabinet that holds the electricity meter, help.
- We find out which grid operator the address belongs to.
- We send the pre-notification when it is required.
- We do the work and send the completion notice.
Pre-notification and completion notice are included in the price list items where it says so. Changing the main fuse between 16, 20 and 25 A, for example, costs SEK 686. More items are in the price list for meter cabinets and main fuses.
Just over one in three houses was built before 1941
Trelleborg municipality has 11,434 dwellings in houses (detached, semi-detached and terraced), according to Statistics Sweden (SCB). The largest group, 3,340 of them, is in houses built before 1931. If the 1930s are included, 36.4 per cent of the houses were built before 1941. No other of the twelve municipalities we have pages for has a share that high.
An old house does not mean that the wiring has to be redone:
- An older installation may be built to the rules that applied when it was put in, as long as it is in good condition.
- An old fuse box with screw-in fuses (proppskåp) is not prohibited and does not have to be replaced.
- Unearthed sockets may stay, but earthed and unearthed sockets must not be mixed in the same room.
- Anything that is altered or added must follow today’s rules.
The Swedish National Electrical Safety Board, Elsäkerhetsverket, recommends an electrical inspection when a house built before 1970 changes owner, and points out that an electrical inspection is not normally part of an ordinary pre-purchase survey (överlåtelsebesiktning). It is a recommendation, not a legal requirement. The guide to electrical inspection explains when it is worth the money.
A burnt smell, discoloured sockets, screw-in fuses that are too hot to touch and fuses that trip often should be taken seriously whatever the age of the house. We then start with fault-finding. Fault-finding alone does not qualify for the Swedish ROT tax deduction for labour on your home (ROT-avdrag). If you are thinking about a new consumer unit, there is a separate page on replacing the consumer unit in Trelleborg.
Most of the flats are from the 1960s
45.1 per cent of the municipality’s dwellings are in blocks of flats. The largest number of flats, 2,139, are in buildings from 1961–1970. Of the flats, 6,171 are rented and 3,419 are tenant-owner flats (bostadsrätt). In a rented flat it is in most cases the landlord who is responsible for the electrical installation. In a tenant-owner flat the association’s statutes (stadgar) decide, and normally you are responsible for the electrics from the flat’s consumer unit inwards.
33 kilometres from Malmö
We are based in Malmö. Trelleborg C is 33.3 kilometres away, about 34 minutes by car without traffic. A travel charge of SEK 500 is added to the prices in the price list. LVJ-EL is registered with Elsäkerhetsverket, and the other places are in the overview of where we work as electricians.