| Job | Price | With grön teknik |
|---|---|---|
Zaptec Go 11 kW – with installation Charger, installation, cable and commissioning. | SEK 11,096 | SEK 5,548 |
Zaptec Go 22 kW – with installation Charger, installation, cable and commissioning. | SEK 11,428 | SEK 5,714 |
Zaptec Go front cover – Wood Brown Only when buying a charger. | SEK 598 | SEK 299 |
Zaptec Go front cover – Rock Grey Only when buying a charger. | SEK 598 | SEK 299 |
Zaptec charging cable, three-phase Type 2, 32 A 22 kW – 7.5 m Charging cable from Zaptec. | SEK 2,820 | SEK 1,410 |
Cable holder – Zaptec Chill Materials and fitting. | SEK 436 | SEK 218 |
| Job | Price | With grön teknik |
|---|---|---|
Load balancing, Zaptec Sense – P1 RJ12 Overload protection through the Zaptec app. | SEK 928 | SEK 464 |
Load balancing, Zaptec Sense – HAN RJ45 Overload protection through the Zaptec app. | SEK 948 | SEK 474 |
| Kamstrup P1 RJ12 adapter with 5 V power supply For Kamstrup Omnipower. | SEK 1,267 | – |
All prices are in Swedish kronor (SEK) including 25 per cent VAT, materials and installation. A travel charge of SEK 500 is added. The price with grön teknik is the price after the reduction, if you are a private individual and are entitled to it.
Installing an EV charger (wallbox) costs SEK 11,096 for an 11 kW Zaptec Go and SEK 11,428 for the 22 kW model. The price includes charger, installation, cable, commissioning and 25 per cent VAT. With the Swedish tax reduction for green technology (grön teknik) the prices in the list are SEK 5,548 and SEK 5,714. A travel charge of SEK 500 is added.
11 or 22 kW
Choose 11 kW unless you know you need more. 11 kW corresponds to 16 A on three phases, that is, three live conductors. 22 kW corresponds to 32 A on three phases, and that is more than a 25 A main fuse lets through. The main fuse is the fuse that decides how much electricity the house can use at the same time.
The car sets a limit too. If the car’s on-board charger takes no more than 11 kW, a bigger charger will not make it any faster. The Swedish National Electrical Safety Board, Elsäkerhetsverket, writes that high power is often unnecessary: if you can charge all night, lower power goes a long way.
In the list the models are a few hundred kronor apart. What it costs to raise the main fuse is in the price list for meter cabinets and main fuses.
Load balancing with P1 or HAN
With load balancing the charging power is lowered automatically when the house is using a lot of electricity, so that the main fuse does not trip. The accessory is called Zaptec Sense and connects to the customer port on the electricity meter. Which version you need depends on which port your electricity meter has:
- P1 with the RJ12 connector costs SEK 928, or SEK 464 with grön teknik.
- HAN with the RJ45 connector costs SEK 948, or SEK 474 with grön teknik.
- The adapter for the Kamstrup Omnipower meter costs SEK 1,267. That line has no price with grön teknik in the list.
Send us a photo of the electricity meter and we will see which version fits. How the technology works is in the article on load balancing.
The green technology reduction halves the price
The price with grön teknik in the table is half the price. In 2026 the green technology reduction gives 50 per cent of the cost of labour and materials when you install an EV charger, up to SEK 50,000 per person per year. The deduction is made directly on the invoice, and we help with the application. The conditions in brief:
- You must own the home. The tax reduction does not apply to companies, rented flats or an association’s shared parking.
- Payment must be electronic.
- The Swedish Tax Agency, Skatteverket, accepts the charge point and the materials needed for the installation, such as cabling and brackets. Extra charging cables, travel and freight do not qualify for the tax reduction. So you pay the travel charge in full.
- You cannot get both the Swedish ROT tax deduction for labour on your home (ROT-avdrag) and grön teknik for the same work.
An example: a Zaptec Go 11 kW for SEK 11,096, a Zaptec Sense for SEK 928 and the travel charge of SEK 500 come to SEK 12,524 in total. With grön teknik the lines are SEK 5,548 and SEK 464, and with the travel charge the total is SEK 6,512.
What is not included
The price applies to a standard installation. Three things may be added:
- New or extended consumer unit. If there is no room for the charger’s circuit, the unit has to be extended or replaced. That part does not qualify for grön teknik, but it can qualify for ROT. The prices are in the price list for consumer units.
- Larger main fuse. It has lines of its own and requires a notification to the grid operator (elnätsföretag), the company that owns the local grid, not the company you buy electricity from.
- Accessories. Load balancing, charging cable, cable holder and front cover are separate lines. According to the list, load balancing and front cover are only sold together with a charger. The Zaptec Go has a type 2 socket, and the charging cable between charger and car costs SEK 2,820 if you do not already have one.
The charger must have its own residual current device (RCD) of the right type and may not be connected downstream of the house’s existing RCD. An RCD cuts the power when current leaks to earth. An EV charger must always be installed by a registered electrical installation company (elinstallationsföretag). LVJ-EL is registered with Elsäkerhetsverket, and the registration covers charging stations for electric cars.
Pre-notification depends on the grid operator
Whether the charger needs a pre-notification depends on your grid operator. A pre-notification (föranmälan) is a notice the electrical installation company files with the grid operator before the work starts. E.ON and Kraftringen do not require a pre-notification if the installation is otherwise unchanged. Öresundskraft states that a permanently connected charger must be pre-notified. We check what applies and file the notification when it is required. More is in the article on pre-notification of EV chargers.
What applies to the prices
- A standard installation in a place that is accessible
- The existing cable route can be used
- The prices apply to standard installations under the conditions above.
- Extra work may be added if the existing electrical installation has faults.
- Fault-finding in the existing electrical installation is included only where this is expressly stated.
- Prices are shown including 25 per cent VAT.
- A travel charge of SEK 500 is added. Charges for driving to the site or setting up on site may be added.
- The ROT deduction (the Swedish tax deduction for labour on your home) applies to private individuals and work in the home. The conditions vary, so ask us if you are unsure.
How the work is done is described on the page about EV chargers.