Electrics in new builds

We do the electrical installation in new homes, premises and building projects in Malmö and the rest of Skåne, from the temporary power during the build to an inspected and documented installation. The meter cabinet and consumer unit have fixed prices. The rest we price from the drawings.

Building under construction at night, with a crane and lit floors

What the electrics for a new house include

The electrical installation in a new house is everything from the connection to the grid to the last socket. It is done in stages that follow the build, and the first one begins before there is any house.

  • Site power (byggström). Temporary electricity for the build.
  • Meter cabinet and main supply cable. The cabinet that holds the electricity meter, and the cable from there into the house.
  • Consumer unit. Fuses, residual current devices (RCDs) and the division into circuits. A circuit is the sockets and lights that share one fuse.
  • Conduit, boxes and cable in walls, floors and ceilings.
  • Sockets, switches and lighting outlets (the plug-in outlets for light fittings).
  • Permanently connected appliances, such as the cooker, water heater and fans.
  • Options, such as underfloor heating, EV charger (wallbox), network and controls.

Only registered electrical installation companies (elinstallationsföretag) may do the electrical installations, according to the Swedish National Electrical Safety Board, Elsäkerhetsverket, on its page about the regulations for newly built homes. For a residential building the registration must cover the activity type “Bostäder” (dwellings). LVJ-EL is registered with Elsäkerhetsverket for, among other things, dwellings and for general and public spaces such as offices, shops, restaurants and schools. How to check that yourself is described in the guide to Elsäkerhetsverket’s register search Kolla elföretaget (“check the electrical company”).

Site power and temporary connection

Site power is electricity that the build uses before the house has an installation of its own. The grid operators (elnätsföretag), the companies that own the local grids, not the ones you buy electricity from, call it a temporary connection. It is ordered by an electrical installation company filing a pre-notification (föranmälan), a notice sent to the grid operator before the work starts.

Kraftringen describes the process like this:

  1. You engage an electrical installation company, which files a pre-notification in good time before the connection date you want.
  2. You and the electrical installation company arrange the site power cabinet, the service cable and the conduit. The service cable is the cable from the grid to the cabinet.
  3. The electrical installation company files the completion notice (färdiganmälan) no later than 14 days before the day the power is to be connected.

Other grid operators have their own routines and lead times. In Malmö it is E.ON that owns the grid.

Our price list has two items that concern the temporary power:

  • Free-standing meter cabinet with sockets for temporary power. A 25 A Garo cabinet costs SEK 23,908. It comes with a ground stand, a 16 A CEE socket, an ordinary socket, an RCD for the temporary power, pre-notification and completion notice (för- och färdiganmälan) and up to 10 metres of underground duct. The 63 A cabinet costs SEK 26,676.
  • Temporary installation at a meter position in a block of flats. Pre-notification and completion notice for 16 to 63 A, fitting of gauge pieces and inspection cost SEK 666. A gauge piece is the insert that decides how large a fuse will fit.

Elsäkerhetsverket points out that there are special requirements for electrical installations on building sites. Cables must be protected against damage from site vehicles and machinery. It is also sometimes unclear who is responsible for the temporary power when several companies work on the same site. Settle that from the start. There is more in the guide to site power.

Meter cabinet and connection to the grid

The new house’s connection to the grid must be pre-notified, and the meter cabinet is the first permanent part of the installation. There are two routes:

Solution What is included Price
Free-standing meter cabinet, 25 A, on a ground stand Sockets and RCD for temporary power, pre-notification and completion notice, up to 10 metres of underground duct SEK 23,908
Flush wall-mounted meter cabinet, 25 A Pre-notification and completion notice, up to 10 metres of underground duct SEK 11,194
Flush wall-mounted meter cabinet, 63 A The same installation as the 25 A cabinet SEK 14,919

A flush wall-mounted meter cabinet, which is set into the outer wall, needs an opening of 71 × 54.2 cm in the wall. It has to go on the drawing before the frame is raised. The cable between the cabinet and the consumer unit costs SEK 236 per metre, laid in underground duct and rated for 32 A.

Three things fall outside these prices:

  • Groundworks. You or your groundworks contractor arrange the trench. We lay the ducts and the cable, because that may only be done by an electrical installation company.
  • The grid operator’s connection fee. You pay that to the grid operator.
  • ROT. The price list shows a price with the Swedish ROT tax deduction for labour on your home (ROT-avdrag), but it does not apply to new builds.

Do not choose a larger main fuse than the house needs. The main fuse is the fuse that decides how much electricity the house can use at the same time. Kraftringen writes that 16 to 25 A is enough for most homes, and that the fixed charge gets higher the larger the fuse is. There is more about cabinets and fuses on the page about meter cabinets and main fuses.

The consumer unit also has a fixed price. A unit from Hager with one row and 13 modules costs SEK 5,810, and one with four rows and 52 modules costs SEK 13,794. The whole range is in the fixed prices for consumer units.

How the work is done, from frame to finished installation

The electrics follow the build, and every step has a point when it is easy to do and a point when it is too late.

  1. Planning on the drawing. Sockets, switches, lighting, consumer unit and meter cabinet are decided before the build starts.
  2. Site power. The temporary power is pre-notified and connected.
  3. Conduit and boxes. They are set in walls, floors and ceilings while the frame is open.
  4. Cable. The wires are drawn through the conduit once the house is weathertight.
  5. Meter cabinet and consumer unit. The cabinet is fitted, the cable is brought in and the unit is wired up.
  6. Fitting. Sockets, switches, light fittings and appliances are put up when the surfaces are finished.
  7. Inspection and documentation. The installation is inspected and tested before it is put into use, and it is labelled.
  8. Completion notice. The grid operator is told that the installation is ready to be connected.

The most expensive mistake is deciding late. A socket added on the drawing costs little. The same socket in a finished, painted wall costs considerably more.

Requirements for new electrics that are worth knowing

A new installation must follow today’s rules in full. Under Elsäkerhetsverket’s regulations it must be carried out in line with good electrical safety practice, and the usual way to meet that requirement is to follow the Swedish standard, that is, the Swedish wiring rules (Elinstallationsreglerna, SS 436 40 00).

  • RCD. Today’s rules require an RCD as additional protection for practically all sockets, and it is a requirement for all newly built homes. An RCD cuts the power when current leaks to earth.
  • Earthed sockets with shutters. All sockets must be earthed, and they must have child-safety shutters or be placed so that children cannot reach them.
  • DCL outlets for ceiling lights. They are standard in new builds.
  • Bathrooms. All circuits that supply the bathroom must have a 30 mA RCD, and a socket must sit at least 60 cm from the edge of the bath or 120 cm from the fixing point of the shower head.
  • Inspection before use. A new installation must be inspected and tested before it is put into use.
  • Labelling and documentation. The installation must have the labelling and documentation needed for operation and maintenance, and there must be an up-to-date circuit chart at the consumer unit.

The law does not require any particular certificate. If you want more documentation than the rules require, it has to be in the contract.

Plan for a charger, network and controls from the start

Whatever may come later should get its conduit now. An empty conduit in an open wall costs next to nothing compared with opening the wall again.

  • EV charger. An 11 kW Zaptec Go costs SEK 11,096 installed, or SEK 5,548 with the Swedish tax reduction for green technology (grön teknik). The reduction can also be given for a house under construction. There is more on the page about EV chargers.
  • Network. A flush-mounted network socket costs SEK 1,905. How sockets, wifi access points and cabinets are planned is described on the page about data and networks.
  • Controls. Some systems for controlling lighting and sockets need wiring of their own. Decide on the system before the conduit is set. See the page about smart homes.

Price, quote and why ROT does not apply

The electrics in the house itself have no fixed price, because they depend on the drawings. What decides the price is the size of the house, the number of sockets, switches and lighting outlets, how much is to be done in the kitchen and bathroom and which options you want. We quote from the drawings.

The meter cabinet, the consumer unit and the notifications have fixed prices in which materials, installation and 25 per cent VAT are included. A travel charge of SEK 500 is added. The prices apply to standard installations.

The ROT deduction is never given for new builds. The Swedish Tax Agency, Skatteverket, writes that you cannot get a deduction for building a completely new home or another free-standing building. So count on the price without ROT.

Developers and contractors will find more on the page for building projects. Contact us with drawings and a rough timetable, and we will come back to you with a quote.

Sources

Fixed prices

Materials, installation and VAT are included. A travel charge of SEK 500 is added.

Meter cabinet and main fuse
Job Price With ROT
Garo free-standing meter cabinet 25 A – MMLK-C 1-25 TE16
SEK 23,908 SEK 22,704
Garo free-standing meter cabinet 63 A – MMLK-C 1-63 TE32
SEK 26,676 SEK 25,446
Garo wall-mounted meter cabinet 25 A, grey – GIM 1-25
SEK 11,194 SEK 9,861
Garo wall-mounted meter cabinet 63 A, grey – GIM 1-63
SEK 14,919 SEK 13,560
Garo wall-mounted cabinet 25 A, grey – GUM 1-25
SEK 10,499 SEK 9,209
Garo wall-mounted cabinet 63 A, grey – GUM 2-25
SEK 23,265 SEK 20,169

All prices for meter cabinets and main fuses

Consumer unit
Job Price With ROT
Consumer unit 1×13 – Hager Gamma
SEK 5,810 SEK 4,780
Consumer unit 1×18 – Hager Gamma
SEK 6,578 SEK 5,503
Consumer unit 2×13 – Hager Gamma
SEK 8,627 SEK 7,079
Consumer unit 2×18 – Hager Gamma
SEK 10,020 SEK 8,236
Consumer unit 3×13 – Hager Gamma
SEK 10,689 SEK 8,625
Consumer unit 3×18 – Hager Gamma
SEK 10,689 SEK 8,625

All prices for consumer units

Common questions about electrics for new builds

Why do I not get the ROT deduction on the electrics in a new build?

Skatteverket never gives the ROT deduction for building a completely new home or another free-standing building. In a house, no deduction is given either for alterations or extensions during the first five years after the year the house was completed. For a new build it is therefore the price without ROT in the price list that applies.

How far in advance should site power be ordered?

As early as possible. Kraftringen writes that the pre-notification must arrive in good time before the connection date you want, that pre-notifications are handled in turn and that the electrical installation company must file the completion notice no later than 14 days before the day you want the power. Other grid operators have their own lead times. Get in touch when you know when the groundworks are to start.

Am I allowed to dig the trench for the power cable myself?

Yes, you may dig the trench itself or leave it to a groundworks contractor. Groundworks are not included in our fixed prices. The cable and the conduit, on the other hand, must be laid by someone who is covered by an electrical installation company's self-inspection programme (egenkontrollprogram), according to Elsäkerhetsverket. The programme is the company's own routines for making sure the work is done according to the rules and is checked. Before you dig, check with Ledningskollen where cables and pipes already lie.

What documentation should I get when the electrics are finished?

The rules require the labelling and documentation needed for operation and maintenance, for example a circuit chart at the consumer unit. There is no legal requirement for any particular certificate. Elsäkerhetsverket therefore advises you to write into the contract which documentation you want, and to ask for the inspection and testing before the installation is put into use to be documented.

What do you need to price the electrics in a new house?

Floor plans for every storey and a list of what you want: roughly how many sockets per room, lighting, underfloor heating, EV charger, network and controls. We also need to know where the meter cabinet is to stand, which grid operator owns the grid and when the build is to start. If the house supplier has an electrical drawing, we start from that.

Can I get the tax reduction for an EV charger in a house that is not finished?

Yes, you can. Under the Swedish Income Tax Act (inkomstskattelagen), the tax reduction for green technology (grön teknik) can also be given for a building under construction that is to become a house or an owner-occupied flat (ägarlägenhet), if you own it. In 2026 it is 50 per cent of the cost of labour and materials, up to SEK 50,000 per person per year.

Does the main contractor have to be in Elsäkerhetsverket's register?

No, not if it only buys in the electrical work. Elsäkerhetsverket writes that a main contractor that buys electrical installation services from others does not count as an electrical installation company and is not in the register. The company that actually carries out the electrical work, on the other hand, must be registered. Ask which company it is and check it in the register search Kolla elföretaget.

Tell us what you need help with

Describe the job and feel free to attach photos of the consumer unit and the place. We will come back with questions if needed, and then with a price.