- From us in Malmö
- 23 km, about 24 min by car
- Places we work in include
- Svedala, Bara, Klågerup, Holmeja
- Grid operator
- E.ON, Skånska Energi and Staffanstorps Energi
Buying an older house in Svedala
Svedala municipality has 23,768 inhabitants, and seven in ten homes are houses (detached, semi-detached and terraced): 6,310 of 9,070 according to Statistics Sweden (SCB). Many of them are old: 1,435 homes are in houses built before 1941, and 2,342 in all in houses built in 1970 or earlier.
That matters when you buy a house. The Swedish National Electrical Safety Board, Elsäkerhetsverket, recommends an electrical inspection when an older house changes owner, especially if it was built before 1970. As a rule an electrical inspection is not part of an ordinary pre-purchase survey (överlåtelsebesiktning), and from the day you take over the house you are responsible for the electrical installation. There is no legal requirement for an electrical inspection of homes. The article on electrical inspection sorts out when it is worth the money.
What may stay as it is
An older electrical installation may be built to the rules that applied when it was put in, as long as it is in good condition. What you rebuild or add must follow today’s rules.
| In the house | Does it have to be replaced? | Price if you want to replace it |
|---|---|---|
| Old fuse box with screw-in fuses (proppskåp) | No, if it is in good condition | New Hager Gamma 2×13 consumer unit: SEK 8,627 |
| Unearthed sockets | No, but earthed and unearthed must not be mixed in the same room | SEK 881 per socket |
| No residual current device (RCD) | No, but Elsäkerhetsverket recommends one | SEK 961 |
An RCD cuts the power when current leaks to earth. It should be tested with the test button at least twice a year. The prices include materials, installation and VAT, and the price list also shows the price with the Swedish ROT tax deduction for labour on your home (ROT-avdrag). All the consumer units are under consumer units in the price list.
In an old installation, faults can turn up during the work. Fault-finding in the existing installation is not included in the fixed prices, and extra work may be added if the installation has faults. There is more about this on the page about fault-finding and service.
The seventies house and the EV charger
The single biggest decade among the houses is 1971–1980, with 1,760 homes. If you want to charge an electric car (EV) at home in a house like that, you need to look at the main fuse, which decides how much electricity the house can use at the same time. E.ON writes that a normal 11 kW EV charger (wallbox) corresponds to a 16 A fuse, and that with a 20 A main fuse there is very little power left for anything else while the car is charging.
There are two ways to go:
- Load balancing. The charger cuts back its power when the rest of the house is using a lot of electricity. Zaptec Sense for electricity meters with a P1 port costs SEK 928, or SEK 464 with the Swedish tax reduction for green technology (grön teknik).
- A larger main fuse. E.ON does not charge for raising it up to 25 A, but the ongoing grid fee changes. Above 25 A, E.ON gives a quote for the connection fee. Our work on changing the fuse and filing the notification costs SEK 686 for 16, 20 or 25 A.
The charger itself does not need a pre-notification (föranmälan) to E.ON, that is, a notice filed before it is put up, as long as the electrical installation is otherwise unchanged. The Zaptec Go 11 kW costs SEK 11,096 with installation, or SEK 5,548 with grön teknik.
E.ON states that the processing of connection cases may take somewhat longer than usual between 27 November 2026 and 31 January 2027, because of a system update.
The grid and the houses outside the built-up areas
E.ON Energidistribution owns the grid in most of the municipality. Svedala, Klågerup and Holmeja are in the grid area Skåne Landsbygd. Bara lies close to an area boundary on the grid operators’ map, and both Skånska Energi and Staffanstorps Energi have customers in parts of the municipality. The bill from your grid operator (elnätsföretag), the company that owns the local grid, not the company you buy electricity from, shows which company you have.
Just over 2,800 of the municipality’s inhabitants live outside a built-up area according to SCB, and we take on work there too. If you have an outbuilding, a pump or lighting some way from the house, two rules are worth knowing. Cable in the ground must always be laid by an electrical installation company (elinstallationsföretag), and new sockets outdoors must be protected by an RCD. Connecting a pump in an existing box costs SEK 3,070 in the price list.
Booking an electrician in Svedala
We are based in Malmö. Svedala station is 22.7 kilometres away, around 24 minutes by car without traffic. A travel charge of SEK 500 is added. LVJ-EL is registered with Elsäkerhetsverket for electrical installation work in dwellings and charging stations for electric cars, among other things. The overview of all municipalities is under electricians in Skåne.