- From us in Malmö
- 39 km, about 35 min by car
- Places we work in include
- Eslöv, Marieholm, Stehag, Löberöd, Flyinge, Harlösa
- Grid operator
- Kraftringen, Skånska Energi and E.ON
The right main fuse costs less than one that is too large
The main fuse decides how much electricity you can use at once. According to Kraftringen, which has the grid in the town of Eslöv, 16 to 25 A is enough for most homes. If the main fuses trip often, it may be a sign that you need a larger one.
At Kraftringen the grid fee consists of a transfer fee and a fuse-based fee (säkringsavgift). The fuse-based fee is fixed and follows the size of the main fuse: the larger the fuse, the higher the fee. So raising the fuse shows afterwards on every bill from your grid operator (elnätsföretag), the company that owns the local grid, not the company you buy electricity from. That is a reason to choose the size the house needs, not the largest one possible.
This is what the change looks like with us:
| Change | Fixed price | With the ROT tax deduction (ROT-avdrag) |
|---|---|---|
| Main fuse 16, 20 or 25 A | SEK 686 | SEK 505 |
| Main fuse 35, 50 or 63 A | SEK 885 | SEK 694 |
| Meter board from single-phase to three-phase | SEK 7,660 | SEK 6,305 |
Pre-notification and completion notice (för- och färdiganmälan) to the grid operator are included in all three: one notice before the work is done and one when it is finished. If you want to lower the fuse, Kraftringen makes no charge. Then you pay only for the electrical installer’s work. More items are listed under meter cabinets and main fuses, and the guide to raising the main fuse goes through when it is needed.
From one phase to three
With one phase, that is, one live conductor, and 16 A you can draw roughly 3.7 kW. An 11 kW EV charger (wallbox) needs three phases. So if the house has only one phase, the change to three phases is the first step towards a charger like that.
At Kraftringen a change from single-phase to three-phase must be pre-notified by the electrical installer. You also pay Kraftringen a charge equal to the company’s actual costs. Kraftringen sets that charge, and it is not in the table above.
Old houses and new flats
Eslöv municipality has 8,454 homes in houses (detached, semi-detached and terraced), according to Statistics Sweden (SCB). The largest group, 2,608, is in houses built before 1931, and 35.5 per cent of the houses were built before 1941. Only 3.2 per cent were built in 2011 or later. That is the lowest share among the twelve municipalities we have pages for.
The blocks of flats look different. The largest number of flats are in buildings from 1961–1970, but one flat in five is in a building from 2011 or later. A flat in a building like that was built when earthed sockets and residual current devices (RCDs) were already required.
For an older house, this applies:
- The installation does not have to be replaced because it is old. It must meet the requirements that applied when it was installed and be in good condition.
- The Swedish National Electrical Safety Board, Elsäkerhetsverket, recommends that you go through your electrical installation at least once a year, and more often the older it is.
- An RCD cuts the power when current leaks to earth. It is not a requirement in an older house, but Elsäkerhetsverket recommends fitting one.
Three grid operators in the municipality
Kraftringen Nät has 14,100 grid subscriptions in Eslöv municipality in its sub-area Ringsjö, which includes the town of Eslöv. According to the map of grid areas, Löberöd, Kungshult and Hurva also belong there. Billinge is in Kraftringen’s sub-area Klippan.
Skånska Energi Nät has the south-western part of the municipality, with Harlösa, Gårdstånga, Väggarp and Örtofta. E.ON also has grid in the municipality. Around Stehag, Marieholm, Flyinge and Stockamöllan the boundaries run so close to the villages that only the bill from your grid operator gives a sure answer.
Kraftringen wants a pre-notification for, among other things, a new connection, a change of fuse, a change to the service cable (the incoming cable from the grid to the house) and the addition of more meters. The notifications are handled in the order they arrive, so it pays to be in good time.
From Malmö to Eslöv
We are based in Malmö. It is 38.7 kilometres to Eslöv station, about 35 minutes by car without traffic. A travel charge of SEK 500 is added to the prices in the price list. LVJ-EL is registered with Elsäkerhetsverket, and the other towns are in the overview of where we work as electricians.