- From us in Malmö
- 21 km, about 22 min by car
- Places we work in include
- Lund, Dalby, Södra Sandby, Veberöd, Genarp, Stångby
Three grid areas in the same municipality
Region Skåne lists three grid areas in Lund municipality, each with its own grid operator (elnätsföretag), the company that owns the local grid, not the company you buy electricity from. Which one you have decides where a notification is to be sent and which terms apply.
| Place | Grid operator | Pre-notification (föranmälan) of an EV charger |
|---|---|---|
| The town of Lund with Brunnshög | Kraftringen Nät | No requirement at present |
| Dalby, Södra Sandby, Genarp, Torna Hällestad and Revinge | Skånska Energi Nät | No requirement at present |
| Veberöd | E.ON Energidistribution | Not if the electrical installation is otherwise unchanged |
| Stångby | On the boundary between Kraftringen and Skånska Energi | See the bill from your grid operator |
The table shows where the centre point of each place lies on the grid operators’ map. The boundaries do not follow the boundaries of the built-up areas, and Staffanstorps Energi states that its grid reaches parts of Lund municipality. The reliable information is the name on the bill from your grid operator.
What has to be notified to Kraftringen
The EV charger (wallbox) is the exception. Kraftringen Nät writes that it currently has no requirement for pre-notification, the notice filed with the grid operator before the work starts, when EV chargers or hot tubs are installed, and Skånska Energi Nät writes the same. Other work must always be notified by the electrical installation company (elinstallationsföretag) before it starts. With Kraftringen that includes:
- a changed main fuse, that is, the fuse that decides how much electricity you can use at the same time
- a change from single-phase to three-phase, in other words from one live conductor into the house to three
- a new or altered service cable, which is the cable between the grid and the house
- a temporary connection, for example temporary site power (byggström)
Kraftringen handles pre-notifications in the order they come in, so the notification should go in early in a project. For a change to three-phase Kraftringen charges a fee that corresponds to its actual costs. Our work on a new meter board for three-phase costs SEK 7,660 according to the price list, and that includes the pre-notification and completion notice (för- och färdiganmälan). The steps are described in the article on going from single-phase to three-phase.
Skånska Energi and E.ON have their own instructions, but a changed main fuse is notified to all three. It is the grid operator that sets the requirement for notification, not the Swedish National Electrical Safety Board, Elsäkerhetsverket.
Two in three homes are flats
Lund had 133,575 inhabitants on 30 September 2026 and 58,347 homes in 2025, according to Statistics Sweden (SCB). Of those homes, 66.3 per cent were in blocks of flats and 33.5 per cent in houses (detached, semi-detached and terraced). Among the flats in blocks of flats, 20,125 are tenant-owner flats (bostadsrätt) and 18,541 are rented flats. In a tenant-owner flat you are normally responsible for the electrics from the flat’s consumer unit inwards, but it is the statutes (stadgar) of the tenant-owner association that decide.
The buildings date from very different periods:
- The largest number of flats in blocks of flats are in buildings from 1961–1970, 6,796 in all.
- Just over one in five flats in blocks of flats, 8,286 of them, are in a building from 2011 or later.
- Among the houses, 1971–1980 is the biggest decade with 4,155 homes, and 39.0 per cent are from 1961–1980.
- 3,317 homes in houses are in buildings from before 1941.
A house from the 1960s or 70s was built before earthed sockets became a requirement in new installations in 1994. If the electrics have not been rebuilt, the original consumer unit is still in place, and rooms other than the kitchen may have unearthed sockets. There is no requirement to replace them, but earthed and unearthed sockets must not be mixed in the same room.
Examples from the price list
The prices below include materials, installation and VAT:
- Hager Gamma 1×18 consumer unit: SEK 6,578, or SEK 5,503 with the Swedish ROT tax deduction for labour on your home (ROT-avdrag).
- New flush-mounted double socket with up to 7 metres of cable: SEK 1,720, or SEK 1,333 with ROT.
- Residual current device (RCD) from Hager, four-pole, 25 A: SEK 961, or SEK 673 with ROT. An RCD cuts the power when current leaks to earth.
- Zaptec Go 11 kW with installation: SEK 11,096, or SEK 5,548 with the Swedish tax reduction for green technology (grön teknik).
A travel charge of SEK 500 is added, and the prices apply to standard installations. The price with ROT or grön teknik is the price after the deduction, if you are entitled to it. In 2026 the ROT deduction is 30 per cent of the labour cost, according to the Swedish Tax Agency, Skatteverket. The whole list is under fixed prices.
How to book an electrician in Lund
We are based in Malmö. Lund Central Station is 21.1 kilometres away, around 22 minutes by car without traffic, and we take on work in the city as well as in Dalby, Södra Sandby, Veberöd, Genarp and Stångby. LVJ-EL is registered with Elsäkerhetsverket for electrical installation work in dwellings, offices, shops and charging stations for electric cars, among other things. You can check that in Elsäkerhetsverket’s register search Kolla elföretaget (“check the electrical company”). There are more municipalities in the overview electricians in Skåne.