Whether the EV charger (wallbox) needs a pre-notification depends on your grid operator (elnätsföretag), and the grid operators in Skåne give different answers. A pre-notification (föranmälan) is the notice the electrical installation company (elinstallationsföretag) files with the grid operator before a job starts. When the work is finished, a completion notice (färdiganmälan) follows.
The grid operator decides, not Elsäkerhetsverket
The requirement for pre-notification comes from the grid operator. The Swedish National Electrical Safety Board, Elsäkerhetsverket, stopped regulating the matter on 1 January 2011 and writes in its answer on pre-notification and completion notice that it is now the grid owner itself that sets the requirement. What has to be notified is set out in the grid operators’ contract terms and in their instructions to installers. The industry’s general contract terms for consumers are called ELNÄT 2025 K and are applied from 1 January 2026.
The grid operator is the company that owns the cables up to your house. It is not the same as the electricity supplier, which you buy your electricity from and can change. You cannot choose your grid operator.
What the grid operators in our area state
The statements were read on each company’s website on 28 November 2026.
| Grid operator | Statement on EV chargers | Where the grid is usually found |
|---|---|---|
| E.ON Energidistribution | No pre-notification as long as the electrical installation is not changed. A change of fuse size, a new meter cabinet or similar must be pre-notified. | Malmö, Burlöv, Svedala and Vellinge, and parts of several other municipalities |
| Kraftringen Nät | Currently has no requirement for pre-notification when an EV charger is installed. | The towns of Lund, Lomma and Eslöv |
| Skånska Energi Nät | Currently has no requirement for pre-notification when an EV charger is installed. | Dalby, Södra Sandby, Genarp and Kävlinge |
| Staffanstorps Energi | Charging equipment must always be pre-notified. | The town of Staffanstorp |
| Öresundskraft Elnät | A permanently connected EV charger must be pre-notified before the work begins. | Helsingborg |
| Trelleborgs Elnät | Not clear-cut. The company mentions permanently connected EV chargers in the same paragraph as the requirement for pre-notification, but does not expressly say that the charger itself must be notified. | The town of Trelleborg and its surroundings |
| Landskrona Energi | Not verified. We have not found any statement on EV chargers. | The town of Landskrona |
The column on the far right is a rough guide. The boundaries of the grid areas do not follow the municipal boundaries, so two addresses in the same municipality can have different grid operators. Which one you have is on the bill from your grid operator.
Why the answers differ
It is not possible to say for certain why, because the sources contradict each other. Öresundskraft refers to the contract terms that apply from 1 January 2026 and writes that the requirement applies to an EV charger at a detached house, single-phase or three-phase, with or without load balancing. E.ON and Kraftringen have updated their pages during 2026 and still state that no pre-notification is needed.
We have not been able to read the contract terms in full. So we do not know what they say word for word about EV chargers, and we are not going to guess.
The conclusion is a practical one. Do not rely on a general rule, neither “always” nor “never”. What applies is the answer your own grid operator gives when the installation is to be done, and the answers can change.
When a notification is required regardless of the charger
A notification is required when something else in the installation is changed, even with the grid operators that do not want a pre-notification for the charger itself. That applies, for example, when
- the main fuse is raised or lowered
- the meter cabinet (the cabinet that holds the electricity meter and the main fuses) is replaced
- the house goes from single-phase to three-phase, something Kraftringen expressly requires a pre-notification for
- the charger is to be able to feed electricity from the car back to the grid, known as V2G. That is on Kraftringen’s list of work that must be notified.
The main fuse is the fuse closest to the electricity meter, and it decides how much electricity the house can use at the same time. If you need a larger one, the grid operator has to be contacted, so that the cable feeding the house can take the higher current. That is what Elsäkerhetsverket writes in its information on charging stations.
Often the increase can be avoided. With load balancing the charger lowers its power when the house is using a lot of electricity, and then the fuse you already have is enough.
How a pre-notification works
The procedure is largely the same with all grid operators:
- The electrical installation company files the pre-notification in the grid operator’s service for installers. E.ON, Kraftringen, Skånska Energi and Öresundskraft have their own services. Staffanstorps Energi, Trelleborgs Elnät and Landskrona Energi use the shared service foranmalan.nu.
- The grid operator checks that the grid can take the change and gives its answer. Kraftringen calls the answer an installationsmedgivande (installation consent).
- The work is carried out.
- The electrical installation company files a completion notice when everything is finished.
How long it takes depends on the case. E.ON states that the electrician can get an answer straight away for a simpler job such as a raised meter fuse (mätarsäkring, E.ON’s word for the main fuse), but that a changed connection can take between one and six months. Kraftringen handles pre-notifications in the order they come in. Trelleborgs Energi wants the completion notice no later than two weeks before connection. So if the fuse is to be raised ahead of the charger, it pays to start in good time.
What you need to do yourself
You do not need to notify anything yourself. These things do make it easier, though:
- Find out which grid operator you have. It is on the bill from your grid operator.
- Read off the size of the main fuse, or take a photo of the meter cabinet and the consumer unit.
- Check that the company you hire is in Elsäkerhetsverket’s register. An EV charger must be installed by a registered electrical installation company, and according to Elsäkerhetsverket’s page on installing a charge point the registration must cover the activity type “Övriga anläggningar för användning av el” (other installations for the use of electricity). We show how to search the register in the article on Kolla elföretaget (“check the electrical company”).
- Ask the municipality if you are unsure about a building permit. There is no general requirement for a building permit (bygglov) or a building notification (bygganmälan) for a charge point, but the building committee decides in the individual case.
When to get in touch
We check what applies with your particular grid operator and file the notification when it is required. LVJ-EL is registered with Elsäkerhetsverket, and the registration covers charging stations for electric cars. What the installation costs is in the price list for EV chargers. If the main fuse is to be changed, pre-notification and completion notice are included in the price, which is SEK 686 within 16 to 25 A according to the price list for meter cabinets and main fuses. How we work is described on the page about EV chargers.
Sources
- Elsäkerhetsverket – What applies to pre-notification and completion notice to grid operators? (in Swedish)
- E.ON Energidistribution – Installing an EV charger (in Swedish)
- Kraftringen Nät – Pre-notification and completion notice (in Swedish)
- Öresundskraft – EV chargers (in Swedish)
- Skånska Energi Nät – Pre-notification and completion notice (in Swedish)
- Staffanstorps Energi – For electrical installers (in Swedish)
- Trelleborgs Energi – Pre-notification and completion notice (in Swedish)
- Elsäkerhetsverket – Install your charge point (in Swedish)