- From us in Malmö
- 21 km, about 22 min by car
- Places we work in include
- Lund, Dalby, Södra Sandby, Veberöd, Genarp, Stångby
When the house needs more circuits than the unit has
Lund municipality has 19,520 homes in houses (detached, semi-detached and terraced). 7,605 of them, 39.0 per cent, are in houses built in 1961–1980, and the largest single group is from 1971–1980. If the consumer unit is still the one from the year the house was built, it is between 46 and 65 years old today.
Age is no reason in itself. The Swedish National Electrical Safety Board, Elsäkerhetsverket, writes that an electrical installation must meet the requirements that applied when it was installed and does not have to be replaced just because it is old. A reason that does hold is that the house gets more to supply than the unit has room for:
- an EV charger (wallbox), which should have its own circuit
- a new kitchen with more and larger appliances
- an extension to the house or a converted garage
- a move from single-phase to three-phase, where the house gets three live conductors instead of one
A circuit is the sockets and lights that share one fuse. When every space in the unit is taken there are two ways forward: add a smaller unit next to it, or replace it with a larger one.
Replacement is maintenance, extension is something else
The rules distinguish between two things. If an existing unit is replaced with a new one with the same circuits, it counts as maintenance. Then the rules from when the installation was built apply, and there is no requirement for a residual current device (RCD). Elsäkerhetsverket still recommends that you fit one when the unit is replaced. An RCD cuts the power when current leaks to earth.
If new circuits or new sockets are added, it is an extension. The new part must follow today’s rules, however old the rest of the installation is. The difference between a screw-in fuse and a circuit breaker, a fuse that can be switched back on after it has tripped, is covered in the guide fuse box (proppskåp) or circuit breakers.
Size and price
| Hager Gamma | Price | With ROT |
|---|---|---|
| One row, 13 modules | SEK 5,810 | SEK 4,780 |
| Two rows, 13 modules per row | SEK 8,627 | SEK 7,079 |
| Three rows, 13 modules per row | SEK 10,689 | SEK 8,625 |
| Four rows, 52 modules | SEK 13,794 | SEK 11,214 |
The prices include materials, installation and VAT and apply to a standard installation. A travel charge of SEK 500 is added. In 2026 the Swedish ROT tax deduction for labour on your home (ROT-avdrag) is 30 per cent of the labour cost, up to SEK 50,000 per person per year. Installing or adding to a consumer unit is on the list of work that qualifies for the deduction, kept by the Swedish Tax Agency, Skatteverket. Other sizes are on the page with fixed prices for consumer units.
Three grid operators when the main fuse is changed
Replacing the consumer unit does not change the main fuse, which decides how much electricity the whole house can use at the same time. If you want to raise it at the same time, or go from single-phase to three-phase, a notification has to go to the grid operator (elnätsföretag), the company that owns the local grid, not the company you buy electricity from. Which company that is depends on where you live:
- The town of Lund: Kraftringen Nät. A change of fuse is on the company’s list of work that must be notified. Kraftringen also writes that a larger fuse means a higher fuse-based fee (säkringsavgift), and that the change from single-phase to three-phase carries a charge equal to the company’s actual costs.
- Dalby, Södra Sandby and Genarp: as a rule Skånska Energi Nät.
- Veberöd: E.ON, according to the map of grid areas.
The boundaries do not follow the towns, so the bill from your grid operator gives the sure answer. Raising or lowering the main fuse between 16, 20 and 25 A is in the price list at SEK 686 with pre-notification and completion notice (för- och färdiganmälan), that is, a notification to the grid operator both before and after the work. The background is in the guide to going from single-phase to three-phase.
The flats, new and old
Lund has built a great deal in recent years. 8,286 of the flats in blocks of flats, 21.4 per cent, are in buildings from 2011 or later. They have had RCDs from the start, because these have been required in new homes since 1 January 2000. At the other end there are 5,736 flats in buildings from before 1941.
20,125 of the flats are tenant-owner flats (bostadsrätt). There the statutes (stadgar) of the tenant-owner association (bostadsrättsförening) decide who is responsible for the consumer unit, and normally it is you, from the flat’s consumer unit inwards.
From Malmö to Lund Central Station it is 21.1 kilometres. How the work itself is done is described on the page about replacing a consumer unit.