Three grid operators in one municipality
Which grid operator (elnätsföretag) you have in Lund municipality depends on where you live. The grid operator is the company that owns the local grid, not the company you buy electricity from. It matters, because it is the grid operator and not the Swedish National Electrical Safety Board, Elsäkerhetsverket, that decides whether an EV charger (wallbox) needs a pre-notification (föranmälan), that is, a notice filed before the work is done.
| Where you live | Grid operator | Position on EV chargers |
|---|---|---|
| The town of Lund, including Brunnshög | Kraftringen Nät | No requirement for pre-notification at present |
| Dalby, Södra Sandby, Genarp | Skånska Energi Nät | No requirement for pre-notification at present |
| Veberöd | E.ON Energidistribution | No pre-notification if the electrical installation is otherwise unchanged |
The table shows what normally applies in each place. The information comes from the companies’ own pages, for example Kraftringen’s page on pre-notification and completion notice. The words “at present” are the companies’ own, so we check what applies before every installation.
The boundaries of the grid areas do not follow the built-up areas. Stångby, for example, lies on the boundary between Kraftringen and Skånska Energi. Look at the bill from your grid operator if you are unsure.
The fuse-based fee makes load balancing worth a look
With Kraftringen the grid fee consists of a transfer fee and a fuse-based fee (säkringsavgift), and the fuse-based fee follows the size of the main fuse. It is the main fuse that sets the limit for how much electricity the house can use at one time. “The larger the fuse, the higher the fee”, the company writes, and it also states that a main fuse of 16 to 25 A is enough for most homes.
An 11 kW charger draws 16 A on each of the three phases, that is, the live conductors. If the car charges while the hob and the oven are on, the main fuse can trip. There are two ways round that:
- A larger main fuse. A change of fuse size must be notified to Kraftringen, and the fuse-based fee goes up.
- Load balancing. Equipment at the electricity meter reads the house’s consumption, and the charger lowers the charging power when needed. The Zaptec Sense costs SEK 928 installed, or SEK 464 with the Swedish tax reduction for green technology (grön teknik).
We explain how the technology works in the guide to load balancing.
The houses from 1961–1980
One third of the dwellings in the municipality, 19,520 of them, are in houses (detached, semi-detached and terraced). The largest group was built in 1971–1980, and a total of 7,605 of the houses, 39.0 per cent, went up between 1961 and 1980. In a house from that period we check three things before the charger is fitted:
- whether the consumer unit has space for a separate circuit for the charger, that is, a fuse that only the charger uses
- how large the main fuse is and whether the house has single-phase or three-phase
- where the cable can be run between the consumer unit and the place where the car is parked
If the consumer unit is not large enough, it needs to be extended or replaced. That part does not qualify for grön teknik, but it can qualify for the Swedish ROT tax deduction for labour on your home (ROT-avdrag). What a replacement involves is described on the page about replacing the consumer unit in Lund.
If the house has single-phase, you can still charge. One phase and 16 A gives roughly 3.7 kW, and Elsäkerhetsverket writes that lower charging power often covers the daily commute when the car can charge all night.
Price, grön teknik and tenant-owner flats
The fixed price for the Zaptec Go 11 kW with installation is SEK 11,096. After the green technology reduction, SEK 5,548 remains. The reduction is 50 per cent of labour and materials, up to SEK 50,000 per person per year, and requires that you own your home. A travel charge of SEK 500 is added. From Malmö to Lund Central Station it is 21.1 kilometres.
Lund’s blocks of flats contain 20,125 tenant-owner flats (bostadsrätt). A tenant-owner association’s shared charging spaces do not qualify for grön teknik. The association can instead apply for the grant Ladda bilen (“charge the car”) from the Swedish Environmental Protection Agency, Naturvårdsverket, up to 50 per cent and at most SEK 15,000 per charge point, as long as funding is available.
The whole process is on the page about EV chargers, and more amounts are in the price list for EV chargers.