Skip to content
079-350 31 43

Replacing a consumer unit in Trelleborg

We replace consumer units in Trelleborg, Anderslöv and Skegrie. The largest group of houses in the municipality was built before 1931. A new consumer unit in a house like that solves some things, but not everything, and that is good to know before you order.

Close-up of breakers on a rail in an electrical cabinet
From us in Malmö
33 km, about 34 min by car
Places we work in include
Trelleborg, Anderslöv, Skegrie, Beddingestrand, Smygehamn, Kurland

The largest group of houses was built before 1931

Trelleborg municipality differs from Malmö and Vellinge. Here the largest group of houses (detached, semi-detached and terraced) is not from the 1970s but from the time before 1931: 3,340 of 11,434 homes in houses. Add the 1930s and 4,159 houses, 36.4 per cent, were built before 1941. In Malmö the share is 20.3 per cent and in Vellinge 14.5 per cent, according to Statistics Sweden’s (SCB) figures on dwellings by period of construction.

The year of construction shows which rules existed when the house was built. Earthed sockets became a requirement in new installations in 1994, and residual current devices (RCDs) in new homes on 1 January 2000. A house from 1925 was built long before both. There are three things, however, that the statistics say nothing about:

  • whether the wiring has been replaced since the house was built
  • whether the sockets are earthed
  • whether someone has already fitted an RCD

That only shows when someone opens the consumer unit and looks.

A new unit on old wiring

A new consumer unit replaces the fuses, not the house behind them. If the house has screw-in fuses, they are replaced by circuit breakers, which trip when there is a fault and can be switched back on, and each circuit is clearly labelled. A circuit means the sockets and lights that run on the same fuse. The wiring in the walls and the sockets in the rooms are the same as before the replacement.

That is permitted. Replacing the consumer unit counts as maintenance, and the rest of the installation may stay as it was built as long as it is in good condition. At the same time the Swedish National Electrical Safety Board, Elsäkerhetsverket, writes: “A detached house built in 1950 probably has wiring and other electrical equipment that ought to be replaced.” The authority recommends that the installation is then earthed as well.

If you own the house, this means two things. We inspect and test the part we have worked on before it is put into use, but you are still the holder of the rest of the installation (innehavare), the owner or user who is responsible for it. And the fixed price applies to the consumer unit itself. If the existing installation has faults, extra work may be added, and fault-finding is included only where that is stated explicitly.

RCDs and unearthed sockets

When a consumer unit is replaced there is no requirement for an RCD. Elsäkerhetsverket still recommends fitting one at the same time, and writes that there may be extra reason to do so in a home with an old electrical installation. An RCD cuts the power when current leaks to earth. It also protects unearthed sockets, but it does not replace earthing.

Unearthed sockets do not have to be replaced. If you want earthed sockets in a room, every socket in the room has to be replaced, because earthed and unearthed sockets must not be mixed. In the price list, replacing an unearthed socket with an earthed double socket costs SEK 881, or SEK 617 with the Swedish ROT tax deduction for labour on your home (ROT-avdrag). The background is in the guide to unearthed sockets.

What the consumer unit costs

Item Price With ROT
Hager Gamma, one row of 13 modules SEK 5,810 SEK 4,780
Hager Gamma, two rows of 13 modules SEK 8,627 SEK 7,079
RCD, four-pole 25 A SEK 961 SEK 673

Materials, installation and VAT are included. A travel charge of SEK 500 is added. 10,285 of the municipality’s houses are owner-occupied, and if you own your house you may be entitled to the ROT deduction on the labour cost. All sizes are on the page with fixed prices for consumer units.

Trelleborgs Elnät or E.ON

Replacing the consumer unit does not change the main fuse, which sits where the electricity comes in and decides how much electricity the house can use at once. If it is to be raised or lowered at the same time, a notification has to go to the grid operator (elnätsföretag), the company that owns the local grid, not the company you buy electricity from. Trelleborgs Elnät owns the grid in and around the town of Trelleborg, and according to Trelleborgs Energi the completion notice (färdiganmälan), that is, the notice that the work is finished, must reach the company no later than two weeks before connection. Anderslöv, Klagstorp and Alstad are in E.ON’s grid.

From Malmö Central Station to Trelleborg C it is 33.3 kilometres. How a replacement is done is described on the page about replacing a consumer unit.

More in Trelleborg

Common questions about replacing a consumer unit in Trelleborg

Our house in Trelleborg was built in the 1920s. Is it enough to replace the consumer unit?

That depends on the condition of what is behind the unit. A new unit gives you new circuit breakers and room for an RCD, but the wiring and sockets are the same as before. Elsäkerhetsverket writes that a detached house from 1950 probably has wiring and electrical equipment that ought to be replaced. If the insulation looks damaged or discoloured, more than the unit needs doing.

Who owns the grid in Anderslöv and Smygehamn?

Anderslöv, Klagstorp and Alstad are in E.ON's grid area according to the map of grid areas. Smygehamn and Beddingestrand lie so close to the boundary with Trelleborgs Elnät's area that only the bill from your grid operator gives a sure answer. The town of Trelleborg has Trelleborgs Elnät.

When does Trelleborgs Elnät want the completion notice (färdiganmälan) if the main fuse is changed when the consumer unit is replaced?

No later than two weeks before connection, writes Trelleborgs Energi. A changed main fuse is one of the company's own examples of work where the electrical installer must send a written pre-notification (föranmälan) before the work starts. Whether a replacement without a changed main fuse has to be notified is not clear from the company's text. We check that and file the notification when it is required.

Do I get the ROT deduction for a new consumer unit in a holiday home in Trelleborg municipality?

Yes, if you own the house. The Swedish Tax Agency, Skatteverket, counts holiday homes as houses, and installing or adding to a consumer unit is on the list of work that qualifies for the ROT deduction. In 2026 the deduction is 30 per cent of the labour cost, up to SEK 50,000 per person per year. Materials and travel give no deduction.

Consumer unit replacement in more places

We are based in Malmö. For these places we have gathered what is good to know locally.

Tell us what you need help with

Describe the job and feel free to attach photos of the consumer unit and the place. We will come back with questions if needed, and then with a price.