Skip to content
079-350 31 43

What does an electrician cost? Fixed price or time and materials

With us it costs SEK 388 to replace a socket, SEK 1,720 to fit a new one and SEK 5,810 to change to a new consumer unit, with materials, installation and VAT. Here you can read how a fixed price differs from time and materials and what the law says about the price.

What an electrician costs depends on what is to be done, so we answer with prices per job instead of an hourly rate. With us it costs SEK 388 to replace an earthed socket, SEK 1,720 to fit a new flush-mounted socket and SEK 5,810 to change to a new consumer unit. Materials, installation and 25 per cent VAT are included. A travel charge of SEK 500 is added.

What common electrical jobs cost

The table shows a selection from our price list. The amounts are fixed prices for a standard installation, before any deduction.

Work Fixed price
Replacing an earthed socket, flush-mounted SEK 388
New flush-mounted socket, up to 7 metres of cable SEK 1,720
Changing an unearthed socket to an earthed one, new cable up to 10 metres SEK 881
Replacing a switch, two-way switching SEK 559
Replacing a ceiling lighting outlet SEK 638
Plejd in-box dimmer, installed and commissioned SEK 1,087
Replacing a bathroom extractor fan, PAX Levante 40 SEK 3,769
New consumer unit, one row with 13 modules SEK 5,810
Raising or lowering the main fuse within 16–25 A, with notification SEK 686
Underfloor heating, starter kit for one square metre with thermostat SEK 5,988
Electrical connection of a hot tub SEK 6,966
EV charger (wallbox) Zaptec Go 11 kW, installed SEK 11,096

So if you just want a single socket replaced, you pay SEK 388 for the work and the socket and SEK 500 for the travel charge, SEK 888 in total. The price with the Swedish ROT tax deduction for labour on your home (ROT-avdrag) is shown on every line in the price list. For the charger, the Swedish tax reduction for green technology (grön teknik) applies instead.

Fixed price, approximate price or time and materials

There are three ways of agreeing on the price, and the law treats them differently. The rules are in section 36 of the Swedish Consumer Services Act (konsumenttjänstlagen).

Type of price How it works What the law says
Fixed price The total is set before the work starts The price follows from the agreement
Approximate price estimate The company estimates what it will cost May be exceeded by no more than 15 per cent, if no other limit has been agreed and the company is not entitled to a price supplement
Time and materials You pay for the time and the materials that are used The price must be reasonable
No price mentioned You have not discussed the price at all You are to pay what is reasonable

What is reasonable is assessed by the nature, scope and execution of the service and by what comparable services usually cost. That is a harder discussion to have afterwards than it is to ask in advance.

The most important thing is therefore that both of you know which type of price applies. Ask straight out whether the amount you have been given is a fixed price or an estimate, and ask for the answer in writing. The Swedish National Electrical Safety Board, Elsäkerhetsverket, recommends written agreements for tradespeople’s services, precisely to reduce the risk of things being unclear.

The Act applies when a private individual hires a company. Businesses and tenant-owner associations (bostadsrättsföreningar) are not covered. For them, what the agreement says applies.

Why we do not state an hourly rate

This article contains no hourly rate, and that is deliberate. An hourly rate says little about the final total as long as you do not know three things:

  • how many hours the work takes
  • whether materials are included or added on top
  • what is added for travel, service van and minimum charge.

With a fixed price per job you can compare total against total. If another firm gives you an hourly rate, ask for an estimate of what the whole job will cost. Then you have been given an approximate price estimate, and the 15 per cent limit applies.

What determines the price of jobs outside the list

Jobs that are not in the price list are priced by quote. The same things decide the price with most electricians:

  • The cable route. How far the cable has to be run and through what. The list prices for new sockets apply to up to 5, 7 or 10 metres of cable, depending on the line.
  • Flush-mounted or surface-mounted. A flush-mounted installation is less visible but takes more work. Chasing (cutting channels in the wall) is not included in the list prices.
  • Access. Cramped attics, high ceilings and boxes that have been built in take time.
  • The condition of the installation. Faults that have to be put right before the new work can be connected are a job of their own. Fault-finding is not included in the fixed prices.
  • The materials. Make, range and colour affect the price. In the price list a new flush-mounted double socket costs SEK 1,720 in white Exxact Primo and SEK 1,945 in black Renova.
  • Notification to the grid operator. The grid operator (elnätsföretag) is the company that owns the local grid, not the company you buy electricity from. Notification is required when the main fuse or the meter cabinet is altered, that is, the fuses where the electricity comes into the house or the cabinet where they sit together with the electricity meter.
  • Groundworks. Digging is not included in the prices for cable and meter cabinets.

If you want a quote that holds, send photos of the consumer unit and of the place where the work is to be done, and write roughly how far it is between them.

How to compare two prices

Two prices for the same work can cover different things. Check this before you choose:

  1. Do both cover the same work and the same materials?
  2. Is VAT included?
  3. Is the price before or after ROT? The deduction is 30 per cent of the labour cost and requires that you own your home.
  4. What does the travel cost, and is there a minimum charge?
  5. What counts as standard, and what does anything beyond that cost?
  6. Is the company in Elsäkerhetsverket’s register? We show how to search in the article on the register search Kolla elföretaget (“check the electrical company”).

Price guides and sites that broker quotes often state wide ranges. They do not apply to any particular firm or any particular house, so you cannot order on the basis of them. Use them as a rough indication and then ask for a price for your particular job.

ROT lowers the labour cost, not the materials

In 2026 the ROT deduction is 30 per cent of the labour cost, up to SEK 50,000 per person per year. Materials and travel give no deduction. A job where most of the price is materials, such as a consumer unit, therefore falls less in price than a job that is almost all labour time. We go through which electrical work counts in the article on the ROT deduction for electrical work.

When you do not need an electrician

Some things you may do yourself, and then it only costs the materials:

  • replace a blown screw-in fuse
  • reset a circuit breaker that has tripped, that is, a fuse that switches off and can be switched on again
  • replace an existing socket or an existing switch for no more than 16 A in a box of its own, if you know how to do it
  • replace a permanently connected light in dry rooms inside the home.

New sockets, moved sockets and all work in bathrooms and outdoors must be done by an electrical installation company (elinstallationsföretag). The full list is in the article on what you may do yourself with electricity.

When to get in touch

If your job is in the price list, you already know what it costs. If it is not there, describe what you want done and feel free to send photos via contact and quote. If you want an annual review of the electrics, there is our service plan for SEK 499 a month, which includes a 10 per cent discount on materials.

Sources

Common questions

Why do you not state an hourly rate?

Because an hourly rate does not tell you what the job costs. The final total depends on how many hours it takes, whether materials and travel are included and how part-hours are counted. Instead we have fixed prices for 136 common jobs, where you see the total before you order.

How much more may it cost than the electrician said at the start?

If you have been given an approximate price estimate, the final price may not exceed it by more than 15 per cent, under the Consumer Services Act. The exceptions are if you have agreed a different limit or if the company is entitled to a price supplement. If you have agreed a fixed price, that is the price that applies.

Are materials included in your fixed prices?

Yes. Every line in the price list includes materials, installation and 25 per cent VAT. A travel charge of SEK 500 is added. What is not included is fault-finding in the existing electrical installation and extra work when the conditions differ from a standard installation.

What does an electrical job that is not in the price list cost?

Then you get a quote. The price is mainly determined by how long and difficult the cable route is, whether the installation is to be flush-mounted or surface-mounted, how easy it is to get at and what condition the existing installation is in. Photos and a short description make the quote more reliable.

Can I demand an itemised invoice from the electrician?

Yes. Under the Consumer Services Act the company is obliged to issue an itemised bill for the service if you ask for one. Ask for labour, materials and travel to be shown separately. Then you can also see what the ROT deduction has been calculated on.

Does the travel cost extra when the electrician comes to my home?

With us, a travel charge of SEK 500 is added on top of the prices in the list. Travel costs do not qualify for the ROT deduction. How travel is charged differs between companies, so always ask whether it is included when you compare prices.

Tell us what you need help with

Describe the job and feel free to attach photos of the consumer unit and the place. We will come back with questions if needed, and then with a price.