Start with the bill from your grid operator
The bill from your grid operator (elnätsföretag) shows which company owns the grid where you live. The grid operator is the company that owns the local grid, not the company you buy electricity from. In Staffanstorp municipality that decides whether or not the EV charger (wallbox) has to be notified to the grid operator before the work starts, which is called a pre-notification (föranmälan).
Staffanstorps Energi itself writes: “Our grid covers large parts of Staffanstorp municipality, but not all of it.” The company has around 8,000 electricity subscriptions, and the town of Staffanstorp is in its grid area. Three grid areas meet in Hjärup: two that belong to Kraftringen and one that belongs to E.ON. Kraftringen names western Hjärup as its own. For the rest of Hjärup, and for Nordanå, Kyrkheddinge and Bergströmshusen, which lie close to the boundaries, the bill is the only certain answer.
| Grid owner on the bill | Position on EV chargers |
|---|---|
| Staffanstorps Energi | Charging equipment must always be pre-notified |
| Kraftringen Nät | No requirement for pre-notification at present |
| E.ON Energidistribution | No pre-notification if the electrical installation is otherwise unchanged |
When Staffanstorps Energi owns the grid
The company is clear on its page for electrical installers: “If you are going to install backup power, solar panels, battery storage or charging equipment, you always need to file a pre-notification”. It is the electrical installation company (elinstallationsföretag) that files the pre-notification and the completion notice (för- och färdiganmälan), the first before the work starts and the second when it is finished. With Staffanstorps Energi this is done via foranmalan.nu.
Two things are worth knowing:
- The company charges an hourly fee if the installation is not finished or does not meet the requirements when the completion notice comes in. The installation must therefore be finished and checked before it is notified.
- According to the company, the handling time depends on grid capacity and delivery times. Contact us in good time before the car arrives.
Staffanstorps Energi has decided not to introduce capacity charges (effektavgift). Load balancing is therefore not needed because of the charge, but it prevents the main fuse from tripping when the car is charging while the house is drawing a lot of electricity. The main fuse decides how much electricity can be used at the same time in the whole house. We explain why the grid operators give different answers about notification in the guide to pre-notification of EV chargers.
Two out of three dwellings are houses
Staffanstorp municipality has 10,905 dwellings, and 7,165 of them are in houses (detached, semi-detached and terraced). That is 65.7 per cent. 6,420 of the houses are owner-occupied, and if you own your home you may be entitled to the Swedish tax reduction for green technology (grön teknik).
The houses come from two distinct periods. 3,165 houses, 44.2 per cent, were built in 1961–1980. 1,077 houses, 15.0 per cent, were built in 2011 or later. That gives different starting points:
- Houses from the 1960s and 70s were built before the requirement for a residual current device (RCD), which cuts the power when current leaks to earth. The requirement came for new homes on 1 January 2000. There we first check whether the consumer unit has space for a new circuit, that is, a fuse of its own for the charger, and how large the main fuse is.
- Houses from 2011 or later have had an RCD from the start. The charger must still not be connected downstream of it. The Swedish National Electrical Safety Board, Elsäkerhetsverket, writes that the charger must have its own separate RCD, which can be built in.
If the consumer unit needs to be extended ahead of the charger, that part does not qualify for grön teknik, but it can qualify for the Swedish ROT tax deduction for labour on your home (ROT-avdrag).
Price, deductions and flats
The price is the same whoever owns the grid: SEK 11,096 for the Zaptec Go 11 kW with installation, and SEK 5,548 after the green technology reduction. The charger, cable, commissioning and VAT are included, and the price applies to a standard installation. Load balancing with the Zaptec Sense costs SEK 928, or SEK 464 with grön teknik. A travel charge of SEK 500 is added.
The municipality also has 3,586 flats in blocks of flats, of which 1,612 are tenant-owner flats (bostadsrätt) and 1,963 rented flats. Shared charging spaces do not qualify for grön teknik. Tenant-owner associations and property owners are referred to the grant Ladda bilen (“charge the car”) from the Swedish Environmental Protection Agency, Naturvårdsverket, up to 50 per cent and at most SEK 15,000 per charge point, as long as funding is available.
From Malmö Central Station to the centre of Staffanstorp it is 15.7 kilometres. How an installation is carried out is described on the page about EV chargers, and all the accessories are in the price list for EV chargers.